Project Category: Onshore - oil & gas
11 April 2025
ATP814P BOWEN BASIN CSG & SHALE PROJECT
ATP814P consists of seven disconnected blocks in the Bowen Basin in an area ranging from south of Moranbah up to Newlands in the Northern Bowen Basin. This general area is […]
11 April 2025
ATP814P BOWEN BASIN CSG & SHALE PROJECT
ATP814P consists of seven disconnected blocks in the Bowen Basin in an area ranging from south of Moranbah up to Newlands in the Northern Bowen Basin. This general area is […]
11 April 2025
ATP 688P BOWEN BASIN CSG PROJECT
A project with a reported 3P (proved, probable & possible) Gas Reserves Estimate of 152 Petajoules (PJ) & a gas reserves target of 355PJ. The Tilbrook CSG pilot is designed […]