Project Category: Power stations, Substations, Windfarms, Phone exchanges

COLLINSVILLE NORTH SOLAR PROJECT
11 April 2025

COLLINSVILLE NORTH SOLAR PROJECT

Construction of a solar farm with a generation capacity of up to 150 megawatts (MWac), with current peak capacity estimated to be 130MWdc.
Read More

Topics

COLLINSVILLE NORTH SOLAR PROJECT
11 April 2025

COLLINSVILLE NORTH SOLAR PROJECT

Construction of a solar farm with a generation capacity of up to 150 megawatts (MWac), with current peak capacity estimated to be 130MWdc.
Read More
HAN-HO H2 HYDROGEN HUB
11 April 2025

HAN-HO H2 HYDROGEN HUB

Construction of a green hydrogen hub. The project will produce up to 1.8 million tonnes per annum of green ammonia.
Read More
URANNAH RENEWABLE ENERGY HUB STAGES 1 & 2
11 April 2025

URANNAH RENEWABLE ENERGY HUB STAGES 1 & 2

The Bowen renewable energy hub is 11.4 gigawatt renewable engery project. 1.4 gigawatts of pumped hydro, utilising the proposed Urannah Dam project delivered 2 stages. Stage 1 -A pumped hydro […]
Read More
HYNQ – NORTH QUEENSLAND CLEAN ENERGY PROJECT
11 April 2025

HYNQ – NORTH QUEENSLAND CLEAN ENERGY PROJECT

Construction of a hydrogen, green ammonia, freshwater & renewable electricity export hub. The renewable hydrogen will be used to produce green ammonia, primarily for export markets, & liquid hydrogen for […]
Read More
PROSERPINE WIND FARM
11 April 2025

PROSERPINE WIND FARM

Construction of a 900MW wind farm, located to the west of Peter Faust (Lake Proserpine) Dam & approximately 60 km west of Airlie Beach, in 2 stages. Stage 1: 450MW, […]
Read More
CAPRICORNIA  ENERGY HUB (BOWEN RENEWABLE ENERGY HUB PUMPED HYDRO-ELECTRIC SCHEME)
11 April 2025

CAPRICORNIA ENERGY HUB (BOWEN RENEWABLE ENERGY HUB PUMPED HYDRO-ELECTRIC SCHEME)

The Bowen Renewable Energy Hub (BREH) Pumped Hydro-electric Scheme (PHES) comprises the proposed construction of a PHES along the Broken River, Central Queensland. This PHES will be connected into the […]
Read More
PLEYSTOWE SCHOOL ROAD BATTERY ENERGY STORAGE SYSTEM
11 April 2025

PLEYSTOWE SCHOOL ROAD BATTERY ENERGY STORAGE SYSTEM

Construction of a battery energy storage system with a capacity 200MW/800MWh. Ancillary systems/infrastructure such as (but not limited to) power conversion systems, grid connection equipment, earthing & lightning protection systems, […]
Read More
MACKAY HYDROGEN PRODUCTION FACILITY – PROJECT MARS
11 April 2025

MACKAY HYDROGEN PRODUCTION FACILITY – PROJECT MARS

Construction of a major hydrogen production plant in MacKay.
Read More
MACKAY BATTERY ENERGY STORAGE SYSTEM
11 April 2025

MACKAY BATTERY ENERGY STORAGE SYSTEM

Construction of 50MW battery energy storage system in Mackay.
Read More
MIRANI SOLAR FARM
11 April 2025

MIRANI SOLAR FARM

Construction of a solar farm with an output measuring 60 megawatts. The solar farm to cover 173 hectares & comprise 180,000 solar photovoltaic modules. The solar panels to be installed […]
Read More