Project Category: Power stations, Substations, Windfarms, Phone exchanges
11 April 2025
COLLINSVILLE NORTH SOLAR PROJECT
Construction of a solar farm with a generation capacity of up to 150 megawatts (MWac), with current peak capacity estimated to be 130MWdc.
11 April 2025
COLLINSVILLE NORTH SOLAR PROJECT
Construction of a solar farm with a generation capacity of up to 150 megawatts (MWac), with current peak capacity estimated to be 130MWdc.
11 April 2025
HAN-HO H2 HYDROGEN HUB
Construction of a green hydrogen hub. The project will produce up to 1.8 million tonnes per annum of green ammonia.
11 April 2025
URANNAH RENEWABLE ENERGY HUB STAGES 1 & 2
The Bowen renewable energy hub is 11.4 gigawatt renewable engery project. 1.4 gigawatts of pumped hydro, utilising the proposed Urannah Dam project delivered 2 stages. Stage 1 -A pumped hydro […]
11 April 2025
HYNQ – NORTH QUEENSLAND CLEAN ENERGY PROJECT
Construction of a hydrogen, green ammonia, freshwater & renewable electricity export hub. The renewable hydrogen will be used to produce green ammonia, primarily for export markets, & liquid hydrogen for […]
11 April 2025
PROSERPINE WIND FARM
Construction of a 900MW wind farm, located to the west of Peter Faust (Lake Proserpine) Dam & approximately 60 km west of Airlie Beach, in 2 stages. Stage 1: 450MW, […]
11 April 2025
CAPRICORNIA ENERGY HUB (BOWEN RENEWABLE ENERGY HUB PUMPED HYDRO-ELECTRIC SCHEME)
The Bowen Renewable Energy Hub (BREH) Pumped Hydro-electric Scheme (PHES) comprises the proposed construction of a PHES along the Broken River, Central Queensland. This PHES will be connected into the […]
11 April 2025
PLEYSTOWE SCHOOL ROAD BATTERY ENERGY STORAGE SYSTEM
Construction of a battery energy storage system with a capacity 200MW/800MWh. Ancillary systems/infrastructure such as (but not limited to) power conversion systems, grid connection equipment, earthing & lightning protection systems, […]
11 April 2025
MACKAY HYDROGEN PRODUCTION FACILITY – PROJECT MARS
Construction of a major hydrogen production plant in MacKay.
11 April 2025
MACKAY BATTERY ENERGY STORAGE SYSTEM
Construction of 50MW battery energy storage system in Mackay.
11 April 2025
MIRANI SOLAR FARM
Construction of a solar farm with an output measuring 60 megawatts. The solar farm to cover 173 hectares & comprise 180,000 solar photovoltaic modules. The solar panels to be installed […]