BROUGHTON COAL PROJECT – RAIL LOOP & TRAIN LOAD OUT FACILITY
For the provision of a rail line loop & train load out facility.
11 April 2025
BROUGHTON COAL PROJECT – RAIL LOOP & TRAIN LOAD OUT FACILITY
For the provision of a rail line loop & train load out facility.
11 April 2025
VULCAN SOUTH COAL MINE – RAIL & ROAD INFRASTRUCTURE
Rail loop and train load-out facility at a location between the northern and central pits. Realignment of the existing Saraji Road and services infrastructure required.
11 April 2025
SARAJI EAST COAL PROJECT – RAIL SPUR & BALLOON LOOP & SIGNALLING SYSTEM
For the provision of a new rail spur & balloon loop & signalling system to be located on the site of the existing adjacent Saraji Mine.
11 April 2025
NORTH GAILILEE BASIN RAIL (NGBR) CARMICHAEL RAIL PROJECT
Construction of a 100 million tonne per annum (Mtpa) capacity standard gauge rail line branching off a narrow gauge line in the vicinity of Mistake Creek & trending north-south for […]