Project Category: Underground - including longwall

DITTMER GOLD PROJECT
11 April 2025

DITTMER GOLD PROJECT

A project covering an area of 513sq km, containing the historic, high-grade Dittmer mine which was discovered in 1934 and produced over 54,000 Oz of gold through to 1951. Historic […]
Read More

Topics

DITTMER GOLD PROJECT
11 April 2025

DITTMER GOLD PROJECT

A project covering an area of 513sq km, containing the historic, high-grade Dittmer mine which was discovered in 1934 and produced over 54,000 Oz of gold through to 1951. Historic […]
Read More
MORANBAH SOUTH JOINT VENTURE COAL PROJECT
11 April 2025

MORANBAH SOUTH JOINT VENTURE COAL PROJECT

A project based on a resource estimate of 471 million tonnes (Mt) of coal. Longwall & bord & pillar mining at a rate of 18 million tonnes per annum (Mtpa) […]
Read More
CAVAL RIDGE COAL MINE HORSE PIT EXPANSION PROJECT
11 April 2025

CAVAL RIDGE COAL MINE HORSE PIT EXPANSION PROJECT

Construction of a new pit including relocating of equipment and infrastructure across to the new pit, with various electrical, water, transport and storage facilities to also be constructed, to allow […]
Read More
SARAJI EAST COAL PROJECT – UNDERGROUND COAL MINE
11 April 2025

SARAJI EAST COAL PROJECT – UNDERGROUND COAL MINE

A greenfield underground coal mine development located on MLA 70383.
Read More
SARAJI EAST COAL PROJECT
11 April 2025

SARAJI EAST COAL PROJECT

Development of a greenfield underground single-seam mine operation and associated project infrastructure, adjacent the existing Saraji open cut mine. The Project involves the extraction of up to seven million tonnes […]
Read More
CARBOROUGH DOWNS SOUTH COAL EXTENSION PROJECT
11 April 2025

CARBOROUGH DOWNS SOUTH COAL EXTENSION PROJECT

A direct extension to the existing Carborough Downs underground workings in a south easterly direction, utilising underground Bord and Pillar mining methodology with the ability to produce up to 1.5 […]
Read More
HAIL CREEK COAL OPERATIONS EXPANSION
11 April 2025

HAIL CREEK COAL OPERATIONS EXPANSION

Open cut operations using dragline truck & shovel method based on a resource estimate of 136 million tonnes (Mt) of coal. After an expansion to 8Mtpa capacity, studies investigating underground […]
Read More