Project Category: Water distribution systems, Drainage
11 April 2025
COLLINSVILLE IRRIGATION SCHEME
The Collinsville Irrigation Scheme Project comprises the proposed development of an irrigated agriculturaldevelopment area of up to 25,000 ha. Four master-planned precincts are being investigated located along the Bowen River […]
11 April 2025
COLLINSVILLE IRRIGATION SCHEME
The Collinsville Irrigation Scheme Project comprises the proposed development of an irrigated agriculturaldevelopment area of up to 25,000 ha. Four master-planned precincts are being investigated located along the Bowen River […]
11 April 2025
OAK STREET DRAINAGE RESTORATION
Design & installation of a rehabilitation system using trenchless technology to improve functionality of the drainage infrastructure & restoration of its intended level of performance by insitu lining & concrete […]
11 April 2025
BLOOMSBURY WATER PIPELINE
Construction of a new pipeline, new storage tank & a new booster pump from Midge Point Road, Bloomsbury to Midge Point
11 April 2025
OAK STREET STORMWATER RELINING
Relining of existing reinforced concrete box culverts at Oak Street
11 April 2025
MORANBAH 400ML RAW WATER DAM REMEDIATION WORKS
Remediation works of 400ML raw water dam at Moranbah. Scope of work includes: repair the upstream erosion with compacted soil fill. Place rock protection over geotextile in the upstream erosion […]
11 April 2025
WHITSUNDAY REGIONAL COUNCIL SEWER RELINING WORKS SOUTHERN REGION
Sewer relining works at Whitsunday Regional Council (Proserpine, Cannonvale & Jubilee Pocket). Scope of work includes: CCTV. Cleaning & relining of existing sewer mains including replacement of sections where it […]
11 April 2025
SYDNEY STREET WATER MAIN WORKS
Construction of a new water main for the replacement of the existing ageing water main at Sydney Street between River Street & Shakespeare Street. Scope of work includes: site establishment […]
11 April 2025
BLOOMSBURY WATER PUMP STATION
Design, supply & installation of a demountable chlorination building complete with chlorination materials & equipment necessary for the Bloomsbury Chlorine Dosing System at Bloomsbury Water Pump Station. Scope of work […]
11 April 2025
SARINA NORTHERN DRAINAGE STAGE 2
Construction of an open trunk drain at Sarina. Scope of work includes: site establishment/disestablishment. Location & protection of existing services. Clearing & grubbing works. Earthworks. Backfilling. Erosion & sediment control […]
11 April 2025
HAMILTON PLAINS BORE FLOOD WORKS
The Hamilton Plains Flood Immunity upgrade project will improve the flood immunity of Proserpine Shute Harbour Road for the area between the Bruce Highway & Strathdickie Road. The new road […]