Project Category: Yards, Sidings, Loading docks, Railways, Container terminals.
11 April 2025
NORTH COAST LINE MOUNT OSSA PASSING LOOP EXTENSION
Extension of the passing loop from Chainages 1008.531 to chainage 1010, a length of 1360m.
11 April 2025
NORTH COAST LINE MOUNT OSSA PASSING LOOP EXTENSION
Extension of the passing loop from Chainages 1008.531 to chainage 1010, a length of 1360m.