Project Stage: Development Application

BURDEKIN RIVER PIPELINE
11 April 2025

BURDEKIN RIVER PIPELINE

Construction of a 105km long underground pipeline to transport water from Burdekin Falls Dam along a corridor that will link the Burdekin River at Home Hill, through to Gumlu, Guthalungra, […]
Read More

Topics

BURDEKIN RIVER PIPELINE
11 April 2025

BURDEKIN RIVER PIPELINE

Construction of a 105km long underground pipeline to transport water from Burdekin Falls Dam along a corridor that will link the Burdekin River at Home Hill, through to Gumlu, Guthalungra, […]
Read More
PLEYSTOWE SCHOOL ROAD BATTERY ENERGY STORAGE SYSTEM
11 April 2025

PLEYSTOWE SCHOOL ROAD BATTERY ENERGY STORAGE SYSTEM

Construction of a battery energy storage system with a capacity 200MW/800MWh. Ancillary systems/infrastructure such as (but not limited to) power conversion systems, grid connection equipment, earthing & lightning protection systems, […]
Read More
VULCAN SOUTH COAL MINE – OFFICES, FUEL STORAGE & WORKSHOPS
11 April 2025

VULCAN SOUTH COAL MINE – OFFICES, FUEL STORAGE & WORKSHOPS

Provision of offices, fuel storage & workshops.
Read More
VULCAN SOUTH COAL MINE
11 April 2025

VULCAN SOUTH COAL MINE

A small-scale mining operation, which includes an open-cut mining area and a smaller highwall mining trial area. Premium hard coking coal will be extracted from three separate open-cut pits for […]
Read More
VULCAN SOUTH COAL MINE – RAIL & ROAD INFRASTRUCTURE
11 April 2025

VULCAN SOUTH COAL MINE – RAIL & ROAD INFRASTRUCTURE

Rail loop and train load-out facility at a location between the northern and central pits. Realignment of the existing Saraji Road and services infrastructure required.
Read More
WINCHESTER SOUTH COKING COAL PROJECT
11 April 2025

WINCHESTER SOUTH COKING COAL PROJECT

Based on an updated Mineral Resource Estimate of 1,100Mt coal. Greenfield metallurgical coal mine with a yield of up to 8 million tonnes of product coal for approximately 31 years, […]
Read More
WINCHESTER SOUTH COKING COAL PROJECT – TRANSMISSION LINE
11 April 2025

WINCHESTER SOUTH COKING COAL PROJECT – TRANSMISSION LINE

Construction and maintainance of a 45 km electricity transmission line.
Read More
WINCHESTER SOUTH COKING COAL PROJECT – WATER PIPELINE
11 April 2025

WINCHESTER SOUTH COKING COAL PROJECT – WATER PIPELINE

Construction & operation of a 14 km water pipeline.
Read More
SARAJI EAST COAL PROJECT – GAS & WATER COLLECTION NETWORKS
11 April 2025

SARAJI EAST COAL PROJECT – GAS & WATER COLLECTION NETWORKS

Construction of gas & water collection networks & access tracks.
Read More
SARAJI EAST COAL PROJECT – WATER PIPELINE RELOCATION
11 April 2025

SARAJI EAST COAL PROJECT – WATER PIPELINE RELOCATION

Relocation of the existing Vermont water pipeline.
Read More