Project Stage: Early Planning

COLLINSVILLE IRRIGATION SCHEME
11 April 2025

COLLINSVILLE IRRIGATION SCHEME

The Collinsville Irrigation Scheme Project comprises the proposed development of an irrigated agriculturaldevelopment area of up to 25,000 ha. Four master-planned precincts are being investigated located along the Bowen River […]
Read More

Topics

COLLINSVILLE IRRIGATION SCHEME
11 April 2025

COLLINSVILLE IRRIGATION SCHEME

The Collinsville Irrigation Scheme Project comprises the proposed development of an irrigated agriculturaldevelopment area of up to 25,000 ha. Four master-planned precincts are being investigated located along the Bowen River […]
Read More
CAPRICORNIA  ENERGY HUB (BOWEN RENEWABLE ENERGY HUB PUMPED HYDRO-ELECTRIC SCHEME)
11 April 2025

CAPRICORNIA ENERGY HUB (BOWEN RENEWABLE ENERGY HUB PUMPED HYDRO-ELECTRIC SCHEME)

The Bowen Renewable Energy Hub (BREH) Pumped Hydro-electric Scheme (PHES) comprises the proposed construction of a PHES along the Broken River, Central Queensland. This PHES will be connected into the […]
Read More
TEEMBURRA DAM IMPROVEMENT PROJECT
11 April 2025

TEEMBURRA DAM IMPROVEMENT PROJECT

Upgrade to dam wall to increase capacity during extreme weather events & conform with current design standards.
Read More
MACKAY HYDROGEN PRODUCTION FACILITY – PROJECT MARS
11 April 2025

MACKAY HYDROGEN PRODUCTION FACILITY – PROJECT MARS

Construction of a major hydrogen production plant in MacKay.
Read More
MACKAY BATTERY ENERGY STORAGE SYSTEM
11 April 2025

MACKAY BATTERY ENERGY STORAGE SYSTEM

Construction of 50MW battery energy storage system in Mackay.
Read More
NORTHERN BOWEN BASIN AUGMENTATION
11 April 2025

NORTHERN BOWEN BASIN AUGMENTATION

Construction of a double circuit transmission line between Nebo & Broadlea substations. The line between Nebo & Moorvale South is to be constructed for 275kV. The section from Moorvale South […]
Read More
MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE
11 April 2025

MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE

Construction of a double circuit transmission line between Moranbah & Goonyella Riverside substations. It is proposed to parallel the existing 132kV between Moranbah & Goonyella Riverside & the new transmission […]
Read More
HILL 212 JOINT VENTURE GOLD SILVER PROJECT
11 April 2025

HILL 212 JOINT VENTURE GOLD SILVER PROJECT

A project covering an area of 19.2sq km considered prospective for silver & gold.
Read More
BLUE GRASS CREEK JOINT VENTURE GOLD PROJECT
11 April 2025

BLUE GRASS CREEK JOINT VENTURE GOLD PROJECT

An early stage prospective project covering an area of 24.2sq km located in in the Drummond Basin region, Central Queensland, directly contiguous to the Hill 212 Gold Project.
Read More
EDINBURGH PARK JOINT VENTURE GOLD/COPPER/SILVER PROJECT
11 April 2025

EDINBURGH PARK JOINT VENTURE GOLD/COPPER/SILVER PROJECT

A project covering an area of 108sq km considered prospective for large scale porphyry and epithermal gold-copper-silver mineralisation.
Read More