Project Stage: Exploration, Drilling, Survey & Assessment

ATP 688P BOWEN BASIN CSG PROJECT
11 April 2025

ATP 688P BOWEN BASIN CSG PROJECT

A project with a reported 3P (proved, probable & possible) Gas Reserves Estimate of 152 Petajoules (PJ) & a gas reserves target of 355PJ. The Tilbrook CSG pilot is designed […]
Read More

Topics

ATP 688P BOWEN BASIN CSG PROJECT
11 April 2025

ATP 688P BOWEN BASIN CSG PROJECT

A project with a reported 3P (proved, probable & possible) Gas Reserves Estimate of 152 Petajoules (PJ) & a gas reserves target of 355PJ. The Tilbrook CSG pilot is designed […]
Read More
DITTMER GOLD PROJECT
11 April 2025

DITTMER GOLD PROJECT

A project covering an area of 513sq km, containing the historic, high-grade Dittmer mine which was discovered in 1934 and produced over 54,000 Oz of gold through to 1951. Historic […]
Read More
BUNDARRA COPPER/SILVER/GOLD PROJECT
11 April 2025

BUNDARRA COPPER/SILVER/GOLD PROJECT

A project in the Lower Permian to Triassic Bowen Basin, west of South Connors Arch. Copper mineralisation in the Flora and Kerlong Ranges occurs on and around the margins of […]
Read More
ISAAC PLAINS SOUTH COAL PROJECT
11 April 2025

ISAAC PLAINS SOUTH COAL PROJECT

A project, immediately south of the Isaac Downs mine, on the southern side of the Isaac River, with a Coal Resource of 52Mt. Isaac South hosts the Leichhardt and Vermont […]
Read More
MOORLANDS COAL PROJECT
11 April 2025

MOORLANDS COAL PROJECT

A project based on an upgraded resource estimate (measured, indicated, inferred) of 318.0 million tonnes (Mt). Open cut mining at a rate of 1.9 Mtpa by a contractor using truck […]
Read More
DRUMMOND BASIN GOLD PROJECT
11 April 2025

DRUMMOND BASIN GOLD PROJECT

A project covering an area of approximately 4,700sq km, considered prospective for large, intrusion related gold systems.
Read More