Project Stage: Feasibility Study
11 April 2025
HAN-HO H2 HYDROGEN HUB
Construction of a green hydrogen hub. The project will produce up to 1.8 million tonnes per annum of green ammonia.
11 April 2025
HAN-HO H2 HYDROGEN HUB
Construction of a green hydrogen hub. The project will produce up to 1.8 million tonnes per annum of green ammonia.
11 April 2025
URANNAH RENEWABLE ENERGY HUB STAGES 1 & 2
The Bowen renewable energy hub is 11.4 gigawatt renewable engery project. 1.4 gigawatts of pumped hydro, utilising the proposed Urannah Dam project delivered 2 stages. Stage 1 -A pumped hydro […]
11 April 2025
URANNAH DAM & PIPELINES PROJECT
Construction of a new dam on the Broken River at Urannah in Central Queensland, with additional components that include a water distribution network, comprising 200km of connecting water pipelines & […]
11 April 2025
COLLINSVILLE GREEN ENERGY HUB
Construction of a large-scale wind & solar project proposed for an area near Collinsville and south-west of Bowen, & located within the Northern Queensland Renewable Energy Zone, which will generate […]
11 April 2025
BROUGHTON COAL PROJECT – MINE INFRASTRUCTURE AREA
For the provision of a mine infrastructure area, magazine, workshops, office buildings & crib rooms.
11 April 2025
BROUGHTON COAL PROJECT
A project based on an upgraded Resource Estimate 120.9 million tonnes (Mt), comprising 17.8Mt Measured, 11.1Mt Indicated & 92Mt Inferred Resource. Construction of a 2.4 million tonnes per annum (Mtpa) […]
11 April 2025
BROUGHTON COAL PROJECT – RAIL LOOP & TRAIN LOAD OUT FACILITY
For the provision of a rail line loop & train load out facility.
11 April 2025
BROUGHTON COAL PROJECT – WATER PIPELINE
For the provision of a water pipeline.
11 April 2025
BROUGHTON COAL PROJECT – ROM STOCKPILE
For the provision of a ROM coal stockpile.
11 April 2025
BROUGHTON COAL PROJECT – PROCESSING PLANT
For the provision of a processing plant.