Project Status: Commenced
11 April 2025
NATIONAL HIGHWAY MICRO-SURFACING PACKAGE 2021-2022
Micro-surfacing works within chainages 106.742km to chainages 108.200km at National Highway 10G (Bruce Highway – St Lawrence to Mackay).
11 April 2025
NATIONAL HIGHWAY MICRO-SURFACING PACKAGE 2021-2022
Micro-surfacing works within chainages 106.742km to chainages 108.200km at National Highway 10G (Bruce Highway – St Lawrence to Mackay).
11 April 2025
SHARK SHOW APARTMENTS AIRLIE BEACH ALTERATIONS & ADDITIONS
Renovation of existing 3 storey building & the addition of 3 extra levels for a serviced apartment with 36 x 2 bedroom serviced apartments Ground floor amenities to include 3 […]
11 April 2025
WHITSUNDAY GREEN STAGE 1A
Stage 1a – Construction of pitch & putt course on the southern side of Regatta Boulevard. Existing sales offices building converted to temporarily accommodate combined uses being sales office, golf […]
11 April 2025
BRUCE HIGHWAY ROADWORKS
Bruce Highway upgrades 10H – chainages 19.94 to 51.2km. Works includes: road safety improvements including intersections upgrades, roadside hazard removals, extension of overtaking lane & installing wide centre lanes templates.
11 April 2025
BRUCE HIGHWAY ROADWORKS
Construction of widening & safety improvements at the following locations: Bruce Highway (St Lawrence to Mackay (10G) at chainage 91.0km Swans Road rest area. Bruce Highway (Mackay to Proserpine) (10H) […]
11 April 2025
BRUCE HIGHWAY (10G) ROADWORKS
Asphalt pavement repairs & reseals at Bruce Highway (10G).
11 April 2025
ROCKLEIGH-NORTH MACKAY ROAD ROADWORKS
Pavement rehabilitation works at Rockleigh-North Mackay Road (Oasis Drive to Glenpark Street, 533km – 1.497km).
11 April 2025
WALKERSTON BYPASS
Construction of Walkerston Bypass project. Works to include a new 2 lane, 2-way 10.4 km highway connecting the Peak Downs Highway to the southern end of the Mackay Ring Road […]
11 April 2025
PARKER ROAD RESIDENTIAL SUBDIVISION STAGES 1-3
Reconfiguration of 1 lot into 46 residential lots, 1 balance lot & 1 park lot over 3 stages. Stage 1 – 15 lots & 1 park lot. Stage 2 – […]
11 April 2025
ST BEES BOULEVARD RETIREMENT VILLAGE & RESIDENTIAL SUBDIVISION
Reconfiguration of 1 lot into 2 lots (proposed Lots 1 & 2) & 2 access easements. Reconfiguration of 1 lot into 199 residential lots & 1 residual/balance lot across the […]