MOUNTAIN VISTA ESTATE STAGES 2-4
Posted
11 April 2025
Reconfiguration of 1 lot into 35 rural residential lots & balance lot in Stages 2-4. Stage 2 – 9 lots. Stage 3 – 14 lots. Stage 4 – 12 lots. Associated civil works.
Reconfiguration of 1 lot into 35 rural residential lots & balance lot in Stages 2-4. Stage 2 – 9 lots. Stage 3 – 14 lots. Stage 4 – 12 lots. Associated civil works.