MACKAY REGIONAL COUNCIL SEWAGE PUMP STATIONS

Posted
11 April 2025

Refurbishment works for 10 sewage pump station sites within Council areas at Mackay Regional Council (Pacific Drive No1 Sewage Pump Station (PSEI10) – Blacks Beach, Willetts Road Sewage Pump Station (PSNM11)- North Mackay, Margaret Street Sewage Pump Station (PSMI01) – Mirani, Malcolmson Street No2 Sewage Pump Station (PSMP01) – Mount Pleasant, Camilleri Street Sewage Pump Station (PSEI08) – Eimeo, Gooseponds Sewage Pump Station (PSNM03) – North Mackay, Eimeo Road No1 Sewage Pump Station (PSEI02) – Eimeo, Monique Court Sewage Pump Station (PSAN10) – Andergrove, Shepherd Road Sewage Pump Station (PSEI06) – Eimeo & Sunset Boulevard Sewage Pump Station (PSEI05) – Eimeo). Scope of work includes: site establishment/disestablishment. Temporary fencing & signage. Clearing, grubbing & earth works. Removal of existing pumps & pipe work from pump station wet wells, repair & reline wet wells & penetration pipes & re-installation of the existing pipe work or new pipe work as specified, reinstallation of existing pumps or new pumps, fittings, & appurtenances after relining works. Removal & replacement of existing valves & fittings within existing valve pits. Supply & installation of new wet well & valve pit access lids & safety shields. Installation of flow meter & construction of flow meter pit (Margaret Street Sewage Pump Station PSMI01). Installation of electrical cabling, conduits, & pits between flow meter (Margaret Street Sewage Pump Station PSMI01), odour control unit (Gooseponds Sewage Pump Station PSNM03) & existing switchboards including excavation, conduit laying, placement of marker tape, backfilling, & compaction of trenches. Excavation, pipe laying including placement of marker tape, backfilling, & compaction of trenches for rising main & mobile pump connection arrangement (Margaret Street Sewage Pump Station PSMI01). Installation of new skid mounted odour control unit including support slab/foundation (Gooseponds Sewage Pump Station PSNM03). Construction of new access driveways & hardstand areas. Restoration of all disturbed areas, reinstatement of roads, driveways, footpaths, stormwater swales, fences & grassed areas. Disposal of all waste & excess materials.