MORANBAH 400ML RAW WATER DAM REMEDIATION WORKS
Posted
11 April 2025
Remediation works of 400ML raw water dam at Moranbah. Scope of work includes: repair the upstream erosion with compacted soil fill. Place rock protection over geotextile in the upstream erosion prone area due to the wave action. Place rock protection over geotextile in the upstream slightly eroded areas. Downstream embankment reinstatement with compacted soil fill in the eroded areas. Topsoiling & revegetating the downstream embankment. Repair the eroded areas of the crest of the dam & top soiling and revegetation.