Project Category: Open Cut

BROUGHTON COAL PROJECT – MINE INFRASTRUCTURE AREA
11 April 2025

BROUGHTON COAL PROJECT – MINE INFRASTRUCTURE AREA

For the provision of a mine infrastructure area, magazine, workshops, office buildings & crib rooms.
Read More

Topics

BROUGHTON COAL PROJECT – MINE INFRASTRUCTURE AREA
11 April 2025

BROUGHTON COAL PROJECT – MINE INFRASTRUCTURE AREA

For the provision of a mine infrastructure area, magazine, workshops, office buildings & crib rooms.
Read More
BROUGHTON COAL PROJECT
11 April 2025

BROUGHTON COAL PROJECT

A project based on an upgraded Resource Estimate 120.9 million tonnes (Mt), comprising 17.8Mt Measured, 11.1Mt Indicated & 92Mt Inferred Resource. Construction of a 2.4 million tonnes per annum (Mtpa) […]
Read More
ISAAC PLAINS SOUTH COAL PROJECT
11 April 2025

ISAAC PLAINS SOUTH COAL PROJECT

A project, immediately south of the Isaac Downs mine, on the southern side of the Isaac River, with a Coal Resource of 52Mt. Isaac South hosts the Leichhardt and Vermont […]
Read More
DYSART EAST COAL MINE PROJECT
11 April 2025

DYSART EAST COAL MINE PROJECT

Development & operation of an open cut coal mine & associated infrastructure. To produce approximately 1.9Mtpa of ROM coal.
Read More
MOORLAND THERMAL COAL PROJECT
11 April 2025

MOORLAND THERMAL COAL PROJECT

A thermal coal development with an initially planned 1.9Mtpa run of mine & expansion potential to 4Mtpa run of mine. Existing 14km northwest Blair Athol mine will be used as […]
Read More
SOUTH WALKER CREEK MRA2C COAL PROJECT
11 April 2025

SOUTH WALKER CREEK MRA2C COAL PROJECT

South Walker Creek mine is an open cut mine, operating an open-cut, dragline & truck/excavator method since 1996. Project includes progressive opening & operating low strip ratio pits along the […]
Read More
NEW LENTON THERMAL COAL – STAGE 1
11 April 2025

NEW LENTON THERMAL COAL – STAGE 1

Stage 1 of a project based on a total Resource Estimate of 84 million tonnes (Mt). Initial recommencement of open cut & underground operations on ML70337 to generate up to […]
Read More
KARIN JOINT VENTURE COKING COAL PROJECT
11 April 2025

KARIN JOINT VENTURE COKING COAL PROJECT

The Karin Basin contains multiple, thick coal seams with exceptional coking coal properties; close to rail, water & power infrastructure as well as services in Clermont; Clean seams up to […]
Read More
POITREL COAL MINE CONTINUATION PROJECT
11 April 2025

POITREL COAL MINE CONTINUATION PROJECT

Continuation of the Poitrel open cut coal mine. The mine produced first coal in 2006 and has access to high-quality infrastructure, producing a mix of hard coking coal and pulverised […]
Read More
CALLAN COKING COAL PROJECT
11 April 2025

CALLAN COKING COAL PROJECT

A project covering an area of 231sq km on the eastern edge of the Bowen Basin, considered prospective for coking & pulverised coal injection coal.
Read More