Project Category: Open Cut
11 April 2025
MOORLANDS COAL PROJECT
A project based on an upgraded resource estimate (measured, indicated, inferred) of 318.0 million tonnes (Mt). Open cut mining at a rate of 1.9 Mtpa by a contractor using truck […]
11 April 2025
MOORLANDS COAL PROJECT
A project based on an upgraded resource estimate (measured, indicated, inferred) of 318.0 million tonnes (Mt). Open cut mining at a rate of 1.9 Mtpa by a contractor using truck […]
11 April 2025
WILSON CREEK COAL PROJECT
Proposed shallow open cut thermal coal mine. Based on a resource estimate of 61Mt of shallow Inferred Resource including 39Mt at less than 3:1.
11 April 2025
BYERWEN COAL PROJECT
Development of 8 open cut pits (East Pits 1 & 2, North Pit, South Pits 1 & 2, West Pits 1, 2 & 3) over a life of mine (LoM) […]
11 April 2025
ISAAC PLAINS EAST COAL PROJECT
Development of open cut pits in an adjoining area to the east of the existing Isaac Plains mining lease to extend the life of mine by approximately 7 years. Based […]
11 April 2025
ISAAC DOWNS COAL PROJECT – MINING SERVICES
Open cut mining services at Isaac Downs Coal Project.
11 April 2025
OLIVE DOWNS JOINT VENTURE COAL PROJECT
The proposed action will be a truck & shovel operated open cut coal mine. There will be between two & six open cut pits developed, depending on economic & design […]
11 April 2025
BROADMEADOW EAST COKING COAL PROJECT
A project with an estimated mineral resource of 33Mt within the granted mining lease. A shallow sub-crop and consistent seam thickness of 3.5m – 4.2m within the Leichhardt seam render […]
11 April 2025
ISAAC DOWNS COAL PROJECT
Based on an updated mineral resource of 36.2 million tonnes, with 24.7 million tonnes now classified as a measured resource. Proposed open cut mining operation with the ability to extract […]
11 April 2025
DRUMMOND BASIN GOLD PROJECT
A project covering an area of approximately 4,700sq km, considered prospective for large, intrusion related gold systems.
11 April 2025
BLAIR ATHOL COAL OPERATIONS RECOMMENCEMENT
Planned recommencement of operations at a rate of up to 3 million tonnes per annum (Mtpa).