BRUCE HIGHWAY (MACKAY TO PROSERPINE) ROADWORKS
11 April 2025

BRUCE HIGHWAY (MACKAY TO PROSERPINE) ROADWORKS

Road intersection upgrades & increasing the vertical grade line of the highway through the existing floodway within Jumper Creek at Bruce Highway – Mackay to Proserpine (Knobels Road/Nebia-Coningsby Road).
Read More

Topics

BRUCE HIGHWAY (MACKAY TO PROSERPINE) ROADWORKS
11 April 2025

BRUCE HIGHWAY (MACKAY TO PROSERPINE) ROADWORKS

Road intersection upgrades & increasing the vertical grade line of the highway through the existing floodway within Jumper Creek at Bruce Highway – Mackay to Proserpine (Knobels Road/Nebia-Coningsby Road).
Read More
33A PEAK DOWNS HIGHWAY (MACKAY/WHITSUNDAY DISTRICT) ASPHALT PROGRAM 2021/2022
11 April 2025

33A PEAK DOWNS HIGHWAY (MACKAY/WHITSUNDAY DISTRICT) ASPHALT PROGRAM 2021/2022

Asphalt/pavement repair works at Peak Downs Highway (33A) – Mackay/Whitsunday District.
Read More
MACKAY REGIONAL COUNCIL SEWER PUMP STATION
11 April 2025

MACKAY REGIONAL COUNCIL SEWER PUMP STATION

Construct driveways that safely service Sewer Pump Stations at 9 locations around the Mackay Regional Council area. Works include but are not limited to: earthworks; installation of gravel; concrete & […]
Read More
MWD REASEAL OF 88A & 88B BOWNS DEVELOPMENTAL ROAD & 5307 COLLINSVILLE ELPHINSTONE ROAD
11 April 2025

MWD REASEAL OF 88A & 88B BOWNS DEVELOPMENTAL ROAD & 5307 COLLINSVILLE ELPHINSTONE ROAD

Reseal of 88A Bowen Developmental Road – 0.045 0.580km; 3.040 9.160km; 19.187 23.798km; 23.853 31.662km; 31-672 32.3km; 49.487 61.965km; 61.965 63.26km; 63.260 75.849km & 79.481 80,565km. 88B Bowen Developmental Road […]
Read More
PIONEER VALLEY MOUNTAIN BIKE TRAILS STAGE 2
11 April 2025

PIONEER VALLEY MOUNTAIN BIKE TRAILS STAGE 2

Stage 2 – 82km of bike trials between Finch Hatton & Eungella.
Read More
MACKAY/WHITSUNDAY DISTRICT 2024/25 ASPHALT PROGRAM
11 April 2025

MACKAY/WHITSUNDAY DISTRICT 2024/25 ASPHALT PROGRAM

Site ID A1: Bruce Highway (10H), Overtaking Lanes to Ridgewood Drive;Site ID A2: Mackay – Bucasia Road (856), Phillip Street Intersection;Site ID A3: Mackay – Bucasia Road (856), Holts Road […]
Read More
MACKAY REGIONAL COUNCIL FOOTPATHS
11 April 2025

MACKAY REGIONAL COUNCIL FOOTPATHS

Construction of connecting sections of footpaths within various locations at Mackay Regional Council. Scope of work includes: Project 51695 – Collette Court to Tolchers Lane, Marian. Project 51812 – Nanyima […]
Read More
MT STUART BEDFORD WEIR ROAD REHABILITATION
11 April 2025

MT STUART BEDFORD WEIR ROAD REHABILITATION

Carry out pavement rehabilitation & erosion protection works on Mt Stuart Bedford Weir Road. Scope of work includes: Separable Portion 1 Mt Stuart Bedford Weir Road; the works are located […]
Read More
ISAAC REGIONAL COUNCIL CONCRETE FLOODWAY 2024
11 April 2025

ISAAC REGIONAL COUNCIL CONCRETE FLOODWAY 2024

Upgrade of 7 x unsealed inverts to a concrete floodway & replacement of 2 x existing concrete floodway within various locations at Isaac Regional Council. Scope of work includes: construction […]
Read More
NATIONAL HIGHWAY MICRO-SURFACING PACKAGE 2021-2022
11 April 2025

NATIONAL HIGHWAY MICRO-SURFACING PACKAGE 2021-2022

Micro-surfacing works within chainages 106.742km to chainages 108.200km at National Highway 10G (Bruce Highway – St Lawrence to Mackay).
Read More