Project Council: MACKAY REGIONAL
11 April 2025
9-11 SILVERTON COURT WORKSHOP EXTENSION
Extension to the existing workshop. Reinforced concrete floor, concrete panels, metal sheet cladding, metal roller doors, steel framed metal roof. Associated landscaping.
11 April 2025
9-11 SILVERTON COURT WORKSHOP EXTENSION
Extension to the existing workshop. Reinforced concrete floor, concrete panels, metal sheet cladding, metal roller doors, steel framed metal roof. Associated landscaping.
11 April 2025
66-72 GATEWAY DRIVE WORKSHOP & STORAGE BUILDINGS
Construction of 1087.08sq m workshop, 2 smaller storage buildings (340.74sq m) behind the main workshop & 2 storey ancillary office & administrative spaces. Concrete floor, colour coated metal roof sheeting, […]
11 April 2025
ALDI SUPERMARKET ANDERGROVE
Construction of a new Aldi supermarket. To include retail floor area, paypoints, back of house area & administration area. Undercroft & at grade car parking & landscaping.
11 April 2025
68A IAN WOOD DRIVE BED & BREAKFAST ACCOMMODATION
Construction of a 2 storey bed & breakfast accommodation for 4 guest rooms & massage therapy. Swimming pool. Associated car parking & landscaping.
11 April 2025
7 ENGLISH STREET DUPLEXES
Reconfiguration of 1 lot into 2 lots. Demolition of existing dwelling. Construction of 2 x 1 bedroom x 1 storey duplexes for specialist disability accommodation with second bedroom & amenities […]
11 April 2025
5 GRIFFIN STREETS RESIDENTIAL CARE FACILITY
Construction of a residential care facility to comprise 2 x 2 storey specialist disability accommodation buildings. Each building includes 6 self contained units, common areas with a shared bathroom, kitchen, […]
11 April 2025
7 EVOLUTION DRIVE INDUSTRIAL SUBDIVISION
Reconfiguration of 1 lot into 11 industrial lots (Lots 3-8 & 13, 17, 19, 21 & 22), new road & lots for landscape buffer (Lots 600 & 601). Associated civil […]
11 April 2025
5-7 CORPORATE DRIVE WORKSHOP
Construction of a workshop (1102.2sq m) with 2 storey office (173.1sq m). Tilt up concrete wall panels, colour coated metal wall cladding & roof cladding, roller shutter door, metal gutter […]
11 April 2025
7-17 HEATHS ROAD & 28 KAY COURT MOTOR VEHICLE WORKSHOP
Construction of a motor vehicle workshop comprising service workshop, warehouse, ground floor office & amenities & first floor office.
11 April 2025
335 BRIDGE ROAD UNITS
Construction of 6 x 2 bedroom x 1 storey units. Metal roof sheeting, fibre cement cladding, aluminium framed windows & panel lift garage doors. Car parking for 11 vehicles including […]