Project Industry: CONSTRUCTION
11 April 2025
MOUNTAIN VISTA ESTATE STAGES 2-4
Reconfiguration of 1 lot into 35 rural residential lots & balance lot in Stages 2-4. Stage 2 – 9 lots. Stage 3 – 14 lots. Stage 4 – 12 lots. […]
11 April 2025
MOUNTAIN VISTA ESTATE STAGES 2-4
Reconfiguration of 1 lot into 35 rural residential lots & balance lot in Stages 2-4. Stage 2 – 9 lots. Stage 3 – 14 lots. Stage 4 – 12 lots. […]
11 April 2025
89-97 MAGGIOLO DRIVE WORKSHOP
Construction of a 2 storey industrial building with 3558sq m workshop with service bays, wash bay & 860sq m ancillary office on a vacant site. Reinforced concrete slab, concrete tilt […]
11 April 2025
66-72 GATEWAY DRIVE WAREHOUSE
Construction of a warehouse. Associated car parking & landscaping.
11 April 2025
9-11 SILVERTON COURT WORKSHOP EXTENSION
Extension to the existing workshop. Reinforced concrete floor, concrete panels, metal sheet cladding, metal roller doors, steel framed metal roof. Associated landscaping.
11 April 2025
66-72 GATEWAY DRIVE WORKSHOP & STORAGE BUILDINGS
Construction of 1087.08sq m workshop, 2 smaller storage buildings (340.74sq m) behind the main workshop & 2 storey ancillary office & administrative spaces. Concrete floor, colour coated metal roof sheeting, […]
11 April 2025
ALDI SUPERMARKET ANDERGROVE
Construction of a new Aldi supermarket. To include retail floor area, paypoints, back of house area & administration area. Undercroft & at grade car parking & landscaping.
11 April 2025
68A IAN WOOD DRIVE BED & BREAKFAST ACCOMMODATION
Construction of a 2 storey bed & breakfast accommodation for 4 guest rooms & massage therapy. Swimming pool. Associated car parking & landscaping.
11 April 2025
7 ENGLISH STREET DUPLEXES
Reconfiguration of 1 lot into 2 lots. Demolition of existing dwelling. Construction of 2 x 1 bedroom x 1 storey duplexes for specialist disability accommodation with second bedroom & amenities […]
11 April 2025
5 GRIFFIN STREETS RESIDENTIAL CARE FACILITY
Construction of a residential care facility to comprise 2 x 2 storey specialist disability accommodation buildings. Each building includes 6 self contained units, common areas with a shared bathroom, kitchen, […]
11 April 2025
7 EVOLUTION DRIVE INDUSTRIAL SUBDIVISION
Reconfiguration of 1 lot into 11 industrial lots (Lots 3-8 & 13, 17, 19, 21 & 22), new road & lots for landscape buffer (Lots 600 & 601). Associated civil […]