Project Industry: INFRASTRUCTURE
11 April 2025
ISAAC REGIONAL COUNCIL CONCRETE FLOODWAY 2024
Upgrade of 7 x unsealed inverts to a concrete floodway & replacement of 2 x existing concrete floodway within various locations at Isaac Regional Council. Scope of work includes: construction […]
11 April 2025
ISAAC REGIONAL COUNCIL CONCRETE FLOODWAY 2024
Upgrade of 7 x unsealed inverts to a concrete floodway & replacement of 2 x existing concrete floodway within various locations at Isaac Regional Council. Scope of work includes: construction […]
11 April 2025
MWD REASEAL OF 88A & 88B BOWNS DEVELOPMENTAL ROAD & 5307 COLLINSVILLE ELPHINSTONE ROAD
Reseal of 88A Bowen Developmental Road – 0.045 0.580km; 3.040 9.160km; 19.187 23.798km; 23.853 31.662km; 31-672 32.3km; 49.487 61.965km; 61.965 63.26km; 63.260 75.849km & 79.481 80,565km. 88B Bowen Developmental Road […]
11 April 2025
ISAAC REGIONAL COUNCIL PAVEMENT RESTORATION WORKS
Restoration works of pavement for 6 x local roads within various location at Isaac Regional Council (Russell Park Road, Mount McLaren Road, Peak Downs Mine Road, Barmount Road & Mabbin […]
11 April 2025
PIONEER VALLEY MOUNTAIN BIKE TRAILS STAGE 2
Stage 2 – 82km of bike trials between Finch Hatton & Eungella.
11 April 2025
NEW LENTON COAL PROJECT – ROAD REALIGNMENT
Works to include the realignment of Suttor Developmental Road as it bisects the project coal resource area.
11 April 2025
BRUCE HIGHWAY (MACKAY RING ROAD BALD HILL CONNECTION) ROADWORKS
Upgrade works for approximately 400m section from 2 lane undivided carriageway to a 4 lanes divided carriageway at Bruce Highway (Mackay Ring Road Bald Hill connection).
11 April 2025
MACKAY REGIONAL COUNCIL PIONEER VALLEY BRIDGES WORKS
Construction works associated with rehabilitation &/or renewal of the bridge assets within 5 sites at Mackay Regional Council – Pioneer Valley area (Site 1 – Walker-Finn Road Bridge – Pinnacle, […]
11 April 2025
BRUCE HIGHWAY & MACKAY BUCASIA ROAD ASPHALT REPLACEMENT WORKS
Asphalt replacement works at Bruce Highway & Mackay Bucasia Road.
11 April 2025
PETRIE STREET CULVERT UPGRADE
Replacement of the floodgates at the Petrie Street culvert crossing & installation of a new trash rack & maintenance ramp in the southeast main drain upstream.
11 April 2025
PEAK DOWNS & GREGORY HIGHWAYS ROADWORKS
Slurry micro-surfacing works on Peak Downs Highway & Gregory Highway.