Project Industry: MINING

MOUNT COOLON JOINT VENTURE GOLD PROJECT – EUGENIA MINING INFRASTRUCTURE
11 April 2025

MOUNT COOLON JOINT VENTURE GOLD PROJECT – EUGENIA MINING INFRASTRUCTURE

Construction of infrastructure for the Eugenia deposit to include site security gate, container or modular type offices, cyanide receiving & mixing system, site potable water treatment, sanitary waste water collection, […]
Read More

Topics

MOUNT COOLON JOINT VENTURE GOLD PROJECT – EUGENIA MINING INFRASTRUCTURE
11 April 2025

MOUNT COOLON JOINT VENTURE GOLD PROJECT – EUGENIA MINING INFRASTRUCTURE

Construction of infrastructure for the Eugenia deposit to include site security gate, container or modular type offices, cyanide receiving & mixing system, site potable water treatment, sanitary waste water collection, […]
Read More
MOUNT COOLON JOINT VENTURE GOLD PROJECT – HEAP LEACH PLANT
11 April 2025

MOUNT COOLON JOINT VENTURE GOLD PROJECT – HEAP LEACH PLANT

Construction of a heap leach plant.
Read More
MOUNT COOLON JOINT VENTURE GOLD PROJECT – CIL PLANT
11 April 2025

MOUNT COOLON JOINT VENTURE GOLD PROJECT – CIL PLANT

Construction of a CIL plant.
Read More
MOUNT COOLON JOINT VENTURE GOLD PROJECT
11 April 2025

MOUNT COOLON JOINT VENTURE GOLD PROJECT

Upgraded Resource Estimate of 1.4Mt averaging 2.6 g/t Au containing an estimated 118,700 ounces of gold for the Koala Gold Mine. Eugenia prospect has an upgraded Resource Estimate of 305t […]
Read More
YANDAN MINE SITE GOLD PROJECT
11 April 2025

YANDAN MINE SITE GOLD PROJECT

A project, covering an area of 952sq km, based on a Total Mineral Resource Estimate of 15.9 Mt @ 1.0 g/tAu for 514,500 oz Au. Project originally produced 350,000 oz […]
Read More
CARMICHAEL COAL MINE & RAIL PROJECT – EXPRESSION OF INTEREST CONSTRUCTION OF MINE AFFECTED WATER DAM
11 April 2025

CARMICHAEL COAL MINE & RAIL PROJECT – EXPRESSION OF INTEREST CONSTRUCTION OF MINE AFFECTED WATER DAM

Bravus Mining and Resources is opening expressions of interest for suitably qualified and experienced earthworks and civil construction contractors to construct the Mine Affected Dam (MAW), at the Carmichael Coal […]
Read More
VULCAN SOUTH COAL MINE – RAIL & ROAD INFRASTRUCTURE
11 April 2025

VULCAN SOUTH COAL MINE – RAIL & ROAD INFRASTRUCTURE

Rail loop and train load-out facility at a location between the northern and central pits. Realignment of the existing Saraji Road and services infrastructure required.
Read More
MOUNT CARLTON GOLD SILVER & COPPER OPERATIONS
11 April 2025

MOUNT CARLTON GOLD SILVER & COPPER OPERATIONS

A 12 year life-of-mine (LoM) project based on a Reserve Estimate of 9.7million tonnes (Mt) containing 17,346,000ounces of silver, 34,000t of copper & 812,000ounces of gold. Open cut extraction at […]
Read More
CLERMONT JOINT VENTURE COPPER PROJECT
11 April 2025

CLERMONT JOINT VENTURE COPPER PROJECT

A project covering an area of approximately 240sq km, hosting the Rosevale Porphyry Corridor which contains copper-gold-molybdenum mineralised systems.
Read More
ISAAC RIVER COKING COAL PROJECT
11 April 2025

ISAAC RIVER COKING COAL PROJECT

A project covering an area of 14sq km, based on an updated Mineral Resource Estimate of 8.7Mt of which 5.5Mt is Indicated & 3.2Mt is Inferred. Proposed open cut along […]
Read More