Project Industry: MINING
11 April 2025
WILSON CREEK COAL PROJECT
Proposed shallow open cut thermal coal mine. Based on a resource estimate of 61Mt of shallow Inferred Resource including 39Mt at less than 3:1.
11 April 2025
WILSON CREEK COAL PROJECT
Proposed shallow open cut thermal coal mine. Based on a resource estimate of 61Mt of shallow Inferred Resource including 39Mt at less than 3:1.
11 April 2025
BROADMEADOW EAST COKING COAL PROJECT
A project with an estimated mineral resource of 33Mt within the granted mining lease. A shallow sub-crop and consistent seam thickness of 3.5m – 4.2m within the Leichhardt seam render […]
11 April 2025
MOUNT CLARK WEST JOINT VENTURE COPPER/GOLD PROJECT
A project covering an area of 19.12sq km considered prospective for copper & gold. Drill results to date have confirmed significant intercepts of high-level porphyry-related stockwork quartz veining and alteration.
11 April 2025
ISAAC DOWNS COAL PROJECT
Based on an updated mineral resource of 36.2 million tonnes, with 24.7 million tonnes now classified as a measured resource. Proposed open cut mining operation with the ability to extract […]
11 April 2025
VULCAN MINE COMPLEX PROJECT
A project covering and area of 408 hectares, located on the Collinsville shelf on the central western margin of the Bowen Basin. Considered prospective for open cut mining, with depth […]
11 April 2025
MOORLANDS COAL PROJECT
A project based on an upgraded resource estimate (measured, indicated, inferred) of 318.0 million tonnes (Mt). Open cut mining at a rate of 1.9 Mtpa by a contractor using truck […]
11 April 2025
NEW LENTON COAL PROJECT – COAL HANDLING & PREPARATION PLANT
For the provision of a Coal Handling & Preparation Plant (CHPP).
11 April 2025
BYERWEN COAL PROJECT
Development of 8 open cut pits (East Pits 1 & 2, North Pit, South Pits 1 & 2, West Pits 1, 2 & 3) over a life of mine (LoM) […]
11 April 2025
NEW LENTON COAL PROJECT – INFRASTRUCTURE
For the provision of infrastructure to include offices, administrations buildings, amenities, including 350 bed accommodation refurbishment, workshops & warehouses.
11 April 2025
ISAAC PLAINS EAST COAL PROJECT
Development of open cut pits in an adjoining area to the east of the existing Isaac Plains mining lease to extend the life of mine by approximately 7 years. Based […]