Project Industry: MINING

NEW LENTON THERMAL COAL – STAGE 1
11 April 2025

NEW LENTON THERMAL COAL – STAGE 1

Stage 1 of a project based on a total Resource Estimate of 84 million tonnes (Mt). Initial recommencement of open cut & underground operations on ML70337 to generate up to […]
Read More

Topics

NEW LENTON THERMAL COAL – STAGE 1
11 April 2025

NEW LENTON THERMAL COAL – STAGE 1

Stage 1 of a project based on a total Resource Estimate of 84 million tonnes (Mt). Initial recommencement of open cut & underground operations on ML70337 to generate up to […]
Read More
THE CARMICHAEL MINE  COAL HANDLING PLANT
11 April 2025

THE CARMICHAEL MINE COAL HANDLING PLANT

Including construction of coal sizing and conveying equipment; construction of coal stockpiling infrastructure; and construction of the train load out infrastructure.
Read More
KARIN JOINT VENTURE COKING COAL PROJECT
11 April 2025

KARIN JOINT VENTURE COKING COAL PROJECT

The Karin Basin contains multiple, thick coal seams with exceptional coking coal properties; close to rail, water & power infrastructure as well as services in Clermont; Clean seams up to […]
Read More
CARMICHAEL COAL MINE & RAIL PROJECT – COAL PREPARATION PLANT
11 April 2025

CARMICHAEL COAL MINE & RAIL PROJECT – COAL PREPARATION PLANT

Design, engineering & construction of Coal Preparation Plant, where the coal is processed and prepared for transport.
Read More
POITREL COAL MINE CONTINUATION PROJECT
11 April 2025

POITREL COAL MINE CONTINUATION PROJECT

Continuation of the Poitrel open cut coal mine. The mine produced first coal in 2006 and has access to high-quality infrastructure, producing a mix of hard coking coal and pulverised […]
Read More
HAIL CREEK COAL OPERATIONS EXPANSION
11 April 2025

HAIL CREEK COAL OPERATIONS EXPANSION

Open cut operations using dragline truck & shovel method based on a resource estimate of 136 million tonnes (Mt) of coal. After an expansion to 8Mtpa capacity, studies investigating underground […]
Read More
DRUMMOND BASIN GOLD PROJECT
11 April 2025

DRUMMOND BASIN GOLD PROJECT

A project covering an area of approximately 4,700sq km, considered prospective for large, intrusion related gold systems.
Read More
HILLALONG JOINT VENTURE COAL PROJECT
11 April 2025

HILLALONG JOINT VENTURE COAL PROJECT

A project covering an area of 99sq km considered prospective for coal. Based on an updated total Mineral Resource Estimate of 106 million tonnes (56M t Inferred and 50M t […]
Read More
BLAIR ATHOL COAL OPERATIONS RECOMMENCEMENT
11 April 2025

BLAIR ATHOL COAL OPERATIONS RECOMMENCEMENT

Planned recommencement of operations at a rate of up to 3 million tonnes per annum (Mtpa).
Read More
EASTERN GALILEE COAL PROJECT
11 April 2025

EASTERN GALILEE COAL PROJECT

A project based on a resource estimate (inferred) of 364 million tonnes up to 150m depth at Yellow Jacket.
Read More