Project Industry: MINING
11 April 2025
NEW LENTON THERMAL COAL – STAGE 1
Stage 1 of a project based on a total Resource Estimate of 84 million tonnes (Mt). Initial recommencement of open cut & underground operations on ML70337 to generate up to […]
11 April 2025
NEW LENTON THERMAL COAL – STAGE 1
Stage 1 of a project based on a total Resource Estimate of 84 million tonnes (Mt). Initial recommencement of open cut & underground operations on ML70337 to generate up to […]
11 April 2025
THE CARMICHAEL MINE COAL HANDLING PLANT
Including construction of coal sizing and conveying equipment; construction of coal stockpiling infrastructure; and construction of the train load out infrastructure.
11 April 2025
KARIN JOINT VENTURE COKING COAL PROJECT
The Karin Basin contains multiple, thick coal seams with exceptional coking coal properties; close to rail, water & power infrastructure as well as services in Clermont; Clean seams up to […]
11 April 2025
CARMICHAEL COAL MINE & RAIL PROJECT – COAL PREPARATION PLANT
Design, engineering & construction of Coal Preparation Plant, where the coal is processed and prepared for transport.
11 April 2025
POITREL COAL MINE CONTINUATION PROJECT
Continuation of the Poitrel open cut coal mine. The mine produced first coal in 2006 and has access to high-quality infrastructure, producing a mix of hard coking coal and pulverised […]
11 April 2025
HAIL CREEK COAL OPERATIONS EXPANSION
Open cut operations using dragline truck & shovel method based on a resource estimate of 136 million tonnes (Mt) of coal. After an expansion to 8Mtpa capacity, studies investigating underground […]
11 April 2025
DRUMMOND BASIN GOLD PROJECT
A project covering an area of approximately 4,700sq km, considered prospective for large, intrusion related gold systems.
11 April 2025
HILLALONG JOINT VENTURE COAL PROJECT
A project covering an area of 99sq km considered prospective for coal. Based on an updated total Mineral Resource Estimate of 106 million tonnes (56M t Inferred and 50M t […]
11 April 2025
BLAIR ATHOL COAL OPERATIONS RECOMMENCEMENT
Planned recommencement of operations at a rate of up to 3 million tonnes per annum (Mtpa).
11 April 2025
EASTERN GALILEE COAL PROJECT
A project based on a resource estimate (inferred) of 364 million tonnes up to 150m depth at Yellow Jacket.