Project Industry: UTILITIES
11 April 2025
CANNONVALE SEWAGE TREATMENT PLANT MEMBRANE REPLACEMENT
Design, supply, transportation, pre-testing, installation, commissioning, & performance verification of replacement membranes for the existing installed membrane modules in the existing membrane trains at Cannonvale Sewage Treatment Plant. Scope of […]
11 April 2025
CANNONVALE SEWAGE TREATMENT PLANT MEMBRANE REPLACEMENT
Design, supply, transportation, pre-testing, installation, commissioning, & performance verification of replacement membranes for the existing installed membrane modules in the existing membrane trains at Cannonvale Sewage Treatment Plant. Scope of […]
11 April 2025
MACKAY BATTERY ENERGY STORAGE SYSTEM
Construction of 50MW battery energy storage system in Mackay.
11 April 2025
URANNAH DAM & PIPELINES PROJECT
Construction of a new dam on the Broken River at Urannah in Central Queensland, with additional components that include a water distribution network, comprising 200km of connecting water pipelines & […]
11 April 2025
MIRANI SOLAR FARM
Construction of a solar farm with an output measuring 60 megawatts. The solar farm to cover 173 hectares & comprise 180,000 solar photovoltaic modules. The solar panels to be installed […]
11 April 2025
WHITSUNDAY REGIONAL COUNCIL SEWER RELINING WORKS SOUTHERN REGION
Sewer relining works at Whitsunday Regional Council (Proserpine, Cannonvale & Jubilee Pocket). Scope of work includes: CCTV. Cleaning & relining of existing sewer mains including replacement of sections where it […]
11 April 2025
MORANBAH 400ML RAW WATER DAM REMEDIATION WORKS
Remediation works of 400ML raw water dam at Moranbah. Scope of work includes: repair the upstream erosion with compacted soil fill. Place rock protection over geotextile in the upstream erosion […]
11 April 2025
COLLINSVILLE GREEN ENERGY HUB
Construction of a large-scale wind & solar project proposed for an area near Collinsville and south-west of Bowen, & located within the Northern Queensland Renewable Energy Zone, which will generate […]
11 April 2025
NORTHERN BOWEN BASIN AUGMENTATION
Construction of a double circuit transmission line between Nebo & Broadlea substations. The line between Nebo & Moorvale South is to be constructed for 275kV. The section from Moorvale South […]
11 April 2025
CLERMONT WASTE MANAGEMENT FACILITY RECONFIGURATION & WEIGHBRIDGE INSTALLATION
Design & construction for reconfiguration of facility & installation of 60T weighbridge at Clermont Waste Management Facility. Scope of work includes: earthworks, concrete works, gatehouse building & associated works.
11 April 2025
OAK STREET DRAINAGE RESTORATION
Design & installation of a rehabilitation system using trenchless technology to improve functionality of the drainage infrastructure & restoration of its intended level of performance by insitu lining & concrete […]