Project Industry: UTILITIES

MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE
11 April 2025

MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE

Construction of a double circuit transmission line between Moranbah & Goonyella Riverside substations. It is proposed to parallel the existing 132kV between Moranbah & Goonyella Riverside & the new transmission […]
Read More

Topics

MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE
11 April 2025

MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE

Construction of a double circuit transmission line between Moranbah & Goonyella Riverside substations. It is proposed to parallel the existing 132kV between Moranbah & Goonyella Riverside & the new transmission […]
Read More
BLOOMSBURY WATER PIPELINE
11 April 2025

BLOOMSBURY WATER PIPELINE

Construction of a new pipeline, new storage tank & a new booster pump from Midge Point Road, Bloomsbury to Midge Point
Read More
LOTUS CREEK WIND FARM
11 April 2025

LOTUS CREEK WIND FARM

Construction of a 285MW wind farm at Lotus Creek on the Connors Range 20km west of St Lawrence comprising 46 Vestas wind turbines each up to 7MW & associated infrastructure […]
Read More
OAK STREET STORMWATER RELINING
11 April 2025

OAK STREET STORMWATER RELINING

Relining of existing reinforced concrete box culverts at Oak Street
Read More
CLARKE CREEK SOLAR FARM
11 April 2025

CLARKE CREEK SOLAR FARM

The Clarke Creek solar farm will be developed with up to 400MW of photovoltaic (PV) solar panel installations on a flat site below the wind farm site. The solar panels […]
Read More
TEEMBURRA DAM IMPROVEMENT PROJECT
11 April 2025

TEEMBURRA DAM IMPROVEMENT PROJECT

Upgrade to dam wall to increase capacity during extreme weather events & conform with current design standards.
Read More
ATP814P BOWEN BASIN CSG & SHALE PROJECT
11 April 2025

ATP814P BOWEN BASIN CSG & SHALE PROJECT

ATP814P consists of seven disconnected blocks in the Bowen Basin in an area ranging from south of Moranbah up to Newlands in the Northern Bowen Basin. This general area is […]
Read More
PLEYSTOWE SCHOOL ROAD BATTERY ENERGY STORAGE SYSTEM
11 April 2025

PLEYSTOWE SCHOOL ROAD BATTERY ENERGY STORAGE SYSTEM

Construction of a battery energy storage system with a capacity 200MW/800MWh. Ancillary systems/infrastructure such as (but not limited to) power conversion systems, grid connection equipment, earthing & lightning protection systems, […]
Read More
DYSART SOLAR FARM
11 April 2025

DYSART SOLAR FARM

Construction of a solar farm of up to 100MW with up to 360,000 solar PV panels.
Read More
KOUMALA WATER TREATMENT PLANT
11 April 2025

KOUMALA WATER TREATMENT PLANT

Construction of a functional water treatment for the township of Koumala. Part A: Civil & Structural Works; supply, construction & installation of civil infrastructure, reinforced concrete foundations & slabs, underground […]
Read More