Project Industry: UTILITIES
11 April 2025
MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE
Construction of a double circuit transmission line between Moranbah & Goonyella Riverside substations. It is proposed to parallel the existing 132kV between Moranbah & Goonyella Riverside & the new transmission […]
11 April 2025
MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE
Construction of a double circuit transmission line between Moranbah & Goonyella Riverside substations. It is proposed to parallel the existing 132kV between Moranbah & Goonyella Riverside & the new transmission […]
11 April 2025
BLOOMSBURY WATER PIPELINE
Construction of a new pipeline, new storage tank & a new booster pump from Midge Point Road, Bloomsbury to Midge Point
11 April 2025
LOTUS CREEK WIND FARM
Construction of a 285MW wind farm at Lotus Creek on the Connors Range 20km west of St Lawrence comprising 46 Vestas wind turbines each up to 7MW & associated infrastructure […]
11 April 2025
OAK STREET STORMWATER RELINING
Relining of existing reinforced concrete box culverts at Oak Street
11 April 2025
CLARKE CREEK SOLAR FARM
The Clarke Creek solar farm will be developed with up to 400MW of photovoltaic (PV) solar panel installations on a flat site below the wind farm site. The solar panels […]
11 April 2025
TEEMBURRA DAM IMPROVEMENT PROJECT
Upgrade to dam wall to increase capacity during extreme weather events & conform with current design standards.
11 April 2025
ATP814P BOWEN BASIN CSG & SHALE PROJECT
ATP814P consists of seven disconnected blocks in the Bowen Basin in an area ranging from south of Moranbah up to Newlands in the Northern Bowen Basin. This general area is […]
11 April 2025
PLEYSTOWE SCHOOL ROAD BATTERY ENERGY STORAGE SYSTEM
Construction of a battery energy storage system with a capacity 200MW/800MWh. Ancillary systems/infrastructure such as (but not limited to) power conversion systems, grid connection equipment, earthing & lightning protection systems, […]
11 April 2025
DYSART SOLAR FARM
Construction of a solar farm of up to 100MW with up to 360,000 solar PV panels.
11 April 2025
KOUMALA WATER TREATMENT PLANT
Construction of a functional water treatment for the township of Koumala. Part A: Civil & Structural Works; supply, construction & installation of civil infrastructure, reinforced concrete foundations & slabs, underground […]