Project Stage: Construction
11 April 2025
VULCAN MINE COMPLEX PROJECT
A project covering and area of 408 hectares, located on the Collinsville shelf on the central western margin of the Bowen Basin. Considered prospective for open cut mining, with depth […]
11 April 2025
VULCAN MINE COMPLEX PROJECT
A project covering and area of 408 hectares, located on the Collinsville shelf on the central western margin of the Bowen Basin. Considered prospective for open cut mining, with depth […]
11 April 2025
NEW LENTON COAL PROJECT – COAL HANDLING & PREPARATION PLANT
For the provision of a Coal Handling & Preparation Plant (CHPP).
11 April 2025
NEW LENTON COAL PROJECT – INFRASTRUCTURE
For the provision of infrastructure to include offices, administrations buildings, amenities, including 350 bed accommodation refurbishment, workshops & warehouses.
11 April 2025
NEW LENTON THERMAL COAL – STAGE 1
Stage 1 of a project based on a total Resource Estimate of 84 million tonnes (Mt). Initial recommencement of open cut & underground operations on ML70337 to generate up to […]
11 April 2025
POITREL COAL MINE CONTINUATION PROJECT
Continuation of the Poitrel open cut coal mine. The mine produced first coal in 2006 and has access to high-quality infrastructure, producing a mix of hard coking coal and pulverised […]
11 April 2025
CARBOROUGH DOWNS SOUTH COAL EXTENSION PROJECT
A direct extension to the existing Carborough Downs underground workings in a south easterly direction, utilising underground Bord and Pillar mining methodology with the ability to produce up to 1.5 […]
11 April 2025
BLAIR ATHOL COAL OPERATIONS RECOMMENCEMENT
Planned recommencement of operations at a rate of up to 3 million tonnes per annum (Mtpa).
11 April 2025
CRYSTALBROOK ROAD ROADWORKS
Pavement rehabilitation work within approximately 1.6km at Crystalbrook Road (chainages 1.81km to chainages 3.40km).
11 April 2025
COLLINSVILLE-ELPHINSTONE ROAD ROADWORKS & DRAINAGE WORKS
Pavement rehabilitation & associated drainage structure upgrade works within chainages 30.66km to 35.20km at Collinsville-Elphinstone Road.
11 April 2025
WHITSUNDAY REGIONAL COUNCIL RESEAL & REHABILITATION PACKAGE 2022/2023
Reseals & pavement rehabilitation works at Whitsunday Regional Council (Bowen, Collinsville, Proserpine & Whitsunday Coast Airport). Scope of work includes: single coat reseals. 2 x coat seals on rehab areas. […]