Project Stage: Construction
11 April 2025
BRUCE HIGHWAY (BOWEN-MERINDA) ROADWORKS
Construction formation widening & intersection upgrades for safety improvements including wide centreline treatment on the Bruce Highway.
11 April 2025
BRUCE HIGHWAY (BOWEN-MERINDA) ROADWORKS
Construction formation widening & intersection upgrades for safety improvements including wide centreline treatment on the Bruce Highway.
11 April 2025
MACKAY/WHITSUNDAY DISTRICT STATE NETWORK RESEAL PROGRAM
Reseal & rut correction works on the Bruce Highway between chainages 66.6041km & chainage 83.352km.
11 April 2025
HAIL CREEK COAL OPERATIONS EXPANSION
Open cut operations using dragline truck & shovel method based on a resource estimate of 136 million tonnes (Mt) of coal. After an expansion to 8Mtpa capacity, studies investigating underground […]
11 April 2025
MACKAY/WHITSUNDAY DISTRICT 2024/25 ASPHALT PROGRAM
Site ID A1: Bruce Highway (10H), Overtaking Lanes to Ridgewood Drive;Site ID A2: Mackay – Bucasia Road (856), Phillip Street Intersection;Site ID A3: Mackay – Bucasia Road (856), Holts Road […]
11 April 2025
ISAAC REGIONAL COUNCIL CONCRETE FLOODWAY 2024
Upgrade of 7 x unsealed inverts to a concrete floodway & replacement of 2 x existing concrete floodway within various locations at Isaac Regional Council. Scope of work includes: construction […]
11 April 2025
NEW LENTON COAL PROJECT – ROAD REALIGNMENT
Works to include the realignment of Suttor Developmental Road as it bisects the project coal resource area.
11 April 2025
NORTH GAILILEE BASIN RAIL (NGBR) CARMICHAEL RAIL PROJECT
Construction of a 100 million tonne per annum (Mtpa) capacity standard gauge rail line branching off a narrow gauge line in the vicinity of Mistake Creek & trending north-south for […]
11 April 2025
33A PEAK DOWNS HIGHWAY (MACKAY/WHITSUNDAY DISTRICT) ASPHALT PROGRAM 2021/2022
Asphalt/pavement repair works at Peak Downs Highway (33A) – Mackay/Whitsunday District.
11 April 2025
MACKAY AIRPORT REDEVELOPMENT
Expansion comprises an upgrade to the car park which will add 247 additional spaces. Other enhancements to the terminal include new retail stores, wide-ranging security upgrades, a transformed check-in area […]
11 April 2025
FORBES ROAD CAUSEWAY REPLACEMENT
Construction for the replacement of existing causeway & fishway at Forbes Road. Scope of work includes: installation of a new higher-level causeway. Realignment & bitumen sealing of the approaches.