Project Stage: Construction
11 April 2025
CATHERINE MCAULEY COLLEGE TECHNICAL HUB & LEARNING CENTRE
Construction of 2 storey learning centre & single storey technical hub with maker space & technical workshops. Associated landscaping & pathways.
11 April 2025
CATHERINE MCAULEY COLLEGE TECHNICAL HUB & LEARNING CENTRE
Construction of 2 storey learning centre & single storey technical hub with maker space & technical workshops. Associated landscaping & pathways.
11 April 2025
ALL METAL SOLUTIONS WORKSHOP EXTENSION
Extension to the existing industrial shed to include workshop, storage, office & amenities. Metal roofing & wall cladding & masonry block wall. Car parking for 32 vehicles including 1 accessible […]
11 April 2025
5 GRIFFIN STREETS RESIDENTIAL CARE FACILITY
Construction of a residential care facility to comprise 2 x 2 storey specialist disability accommodation buildings. Each building includes 6 self contained units, common areas with a shared bathroom, kitchen, […]
11 April 2025
9-11 SILVERTON COURT WORKSHOP EXTENSION
Extension to the existing workshop. Reinforced concrete floor, concrete panels, metal sheet cladding, metal roller doors, steel framed metal roof. Associated landscaping.
11 April 2025
ALDI SUPERMARKET ANDERGROVE
Construction of a new Aldi supermarket. To include retail floor area, paypoints, back of house area & administration area. Undercroft & at grade car parking & landscaping.
11 April 2025
2-4 EMPIRE STREET SERVICE STATION PAGET
Construction of a service station to include control building, service areas, bowsers, canopy, underground fuel tanks & convenience store on a vacant site. Signage. Precast concrete panels with rendered & […]
11 April 2025
26-30 DIESEL DRIVE INDUSTRIAL SHEDS
Construction of 2 industrial sheds with 2 storey offices on a vacant site. Car parking for 27 vehicles. 335.5sq m landscaping.
11 April 2025
BRIDGE ROAD RETIREMENT FACILITY UNITS
Construction of 8 x 1 bedroom retirement facility units in Stages 1-3. Stage 1 – Demolition of 3 duplex buildings & construction of 1 duplex building (2 retirement facility units), […]
11 April 2025
49-51 CENTRAL PARK & IRIDIUM DRIVES WORKSHOPS & WAREHOUSE
Construction of workshops, warehouse & 2 storey office. Signage. Colour coated metal roof sheeting, wall cladding & roller shutter, concrete tilt up panels, steel framed awning & aluminium framed glass […]
11 April 2025
17 CENTURION DRIVE INDUSTRIAL BUILDINGS
Construction of 2 industrial buildings, ancillary office areas & mezzanine for 6 tenancies on a vacant site. Signage. Aluminium framed glass shopfront & glass entry door, concrete tilt panel, colour […]