Project Stage: Development Approval
11 April 2025
COLLINSVILLE NORTH SOLAR PROJECT
Construction of a solar farm with a generation capacity of up to 150 megawatts (MWac), with current peak capacity estimated to be 130MWdc.
11 April 2025
COLLINSVILLE NORTH SOLAR PROJECT
Construction of a solar farm with a generation capacity of up to 150 megawatts (MWac), with current peak capacity estimated to be 130MWdc.
11 April 2025
DYSART SOLAR FARM
Construction of a solar farm of up to 100MW with up to 360,000 solar PV panels.
11 April 2025
MIRANI SOLAR FARM
Construction of a solar farm with an output measuring 60 megawatts. The solar farm to cover 173 hectares & comprise 180,000 solar photovoltaic modules. The solar panels to be installed […]
11 April 2025
LOTUS CREEK WIND FARM
Construction of a 285MW wind farm at Lotus Creek on the Connors Range 20km west of St Lawrence comprising 46 Vestas wind turbines each up to 7MW & associated infrastructure […]
11 April 2025
CLARKE CREEK SOLAR FARM
The Clarke Creek solar farm will be developed with up to 400MW of photovoltaic (PV) solar panel installations on a flat site below the wind farm site. The solar panels […]
11 April 2025
ATP814P BOWEN BASIN CSG & SHALE PROJECT
ATP814P consists of seven disconnected blocks in the Bowen Basin in an area ranging from south of Moranbah up to Newlands in the Northern Bowen Basin. This general area is […]
11 April 2025
MOUNT COOLON JOINT VENTURE GOLD PROJECT – KOALA MINING INFRASTRUCTURE
Construction of mining infrastructure for the Koala deposit to include site security gate, container or modular type offices, cyanide receiving & mixing system, reagent storage shed, fuel storage & generators, […]
11 April 2025
MOUNT COOLON JOINT VENTURE GOLD PROJECT – EUGENIA MINING INFRASTRUCTURE
Construction of infrastructure for the Eugenia deposit to include site security gate, container or modular type offices, cyanide receiving & mixing system, site potable water treatment, sanitary waste water collection, […]
11 April 2025
MOUNT COOLON JOINT VENTURE GOLD PROJECT – HEAP LEACH PLANT
Construction of a heap leach plant.
11 April 2025
MOUNT COOLON JOINT VENTURE GOLD PROJECT – CIL PLANT
Construction of a CIL plant.