Project Status: Commenced

OLIVE DOWNS JOINT VENTURE COAL PROJECT
11 April 2025

OLIVE DOWNS JOINT VENTURE COAL PROJECT

The proposed action will be a truck & shovel operated open cut coal mine. There will be between two & six open cut pits developed, depending on economic & design […]
Read More

Topics

OLIVE DOWNS JOINT VENTURE COAL PROJECT
11 April 2025

OLIVE DOWNS JOINT VENTURE COAL PROJECT

The proposed action will be a truck & shovel operated open cut coal mine. There will be between two & six open cut pits developed, depending on economic & design […]
Read More
ISAAC DOWNS COAL PROJECT
11 April 2025

ISAAC DOWNS COAL PROJECT

Based on an updated mineral resource of 36.2 million tonnes, with 24.7 million tonnes now classified as a measured resource. Proposed open cut mining operation with the ability to extract […]
Read More
VULCAN MINE COMPLEX PROJECT
11 April 2025

VULCAN MINE COMPLEX PROJECT

A project covering and area of 408 hectares, located on the Collinsville shelf on the central western margin of the Bowen Basin. Considered prospective for open cut mining, with depth […]
Read More
NEW LENTON COAL PROJECT – COAL HANDLING & PREPARATION PLANT
11 April 2025

NEW LENTON COAL PROJECT – COAL HANDLING & PREPARATION PLANT

For the provision of a Coal Handling & Preparation Plant (CHPP).
Read More
NEW LENTON COAL PROJECT – INFRASTRUCTURE
11 April 2025

NEW LENTON COAL PROJECT – INFRASTRUCTURE

For the provision of infrastructure to include offices, administrations buildings, amenities, including 350 bed accommodation refurbishment, workshops & warehouses.
Read More
NEW LENTON THERMAL COAL – STAGE 1
11 April 2025

NEW LENTON THERMAL COAL – STAGE 1

Stage 1 of a project based on a total Resource Estimate of 84 million tonnes (Mt). Initial recommencement of open cut & underground operations on ML70337 to generate up to […]
Read More
POITREL COAL MINE CONTINUATION PROJECT
11 April 2025

POITREL COAL MINE CONTINUATION PROJECT

Continuation of the Poitrel open cut coal mine. The mine produced first coal in 2006 and has access to high-quality infrastructure, producing a mix of hard coking coal and pulverised […]
Read More
CARBOROUGH DOWNS SOUTH COAL EXTENSION PROJECT
11 April 2025

CARBOROUGH DOWNS SOUTH COAL EXTENSION PROJECT

A direct extension to the existing Carborough Downs underground workings in a south easterly direction, utilising underground Bord and Pillar mining methodology with the ability to produce up to 1.5 […]
Read More
CRYSTALBROOK ROAD ROADWORKS
11 April 2025

CRYSTALBROOK ROAD ROADWORKS

Pavement rehabilitation work within approximately 1.6km at Crystalbrook Road (chainages 1.81km to chainages 3.40km).
Read More
COLLINSVILLE-ELPHINSTONE ROAD ROADWORKS & DRAINAGE WORKS
11 April 2025

COLLINSVILLE-ELPHINSTONE ROAD ROADWORKS & DRAINAGE WORKS

Pavement rehabilitation & associated drainage structure upgrade works within chainages 30.66km to 35.20km at Collinsville-Elphinstone Road.
Read More