Project Status: Commenced

BRUCE HIGHWAY (MACKAY RING ROAD BALD HILL CONNECTION) ROADWORKS
11 April 2025

BRUCE HIGHWAY (MACKAY RING ROAD BALD HILL CONNECTION) ROADWORKS

Upgrade works for approximately 400m section from 2 lane undivided carriageway to a 4 lanes divided carriageway at Bruce Highway (Mackay Ring Road Bald Hill connection).
Read More

Topics

BRUCE HIGHWAY (MACKAY RING ROAD BALD HILL CONNECTION) ROADWORKS
11 April 2025

BRUCE HIGHWAY (MACKAY RING ROAD BALD HILL CONNECTION) ROADWORKS

Upgrade works for approximately 400m section from 2 lane undivided carriageway to a 4 lanes divided carriageway at Bruce Highway (Mackay Ring Road Bald Hill connection).
Read More
MACKAY AIRPORT REDEVELOPMENT
11 April 2025

MACKAY AIRPORT REDEVELOPMENT

Expansion comprises an upgrade to the car park which will add 247 additional spaces. Other enhancements to the terminal include new retail stores, wide-ranging security upgrades, a transformed check-in area […]
Read More
FORBES ROAD CAUSEWAY REPLACEMENT
11 April 2025

FORBES ROAD CAUSEWAY REPLACEMENT

Construction for the replacement of existing causeway & fishway at Forbes Road. Scope of work includes: installation of a new higher-level causeway. Realignment & bitumen sealing of the approaches.
Read More
PORT OF MACKAY ROADS ASPHALT PROGRAM 2024
11 April 2025

PORT OF MACKAY ROADS ASPHALT PROGRAM 2024

Asphalt program 2024 for the Port of Mackay
Read More
MACKAY REGION CONCRETE BRIDGES REHABILITATION WORKS
11 April 2025

MACKAY REGION CONCRETE BRIDGES REHABILITATION WORKS

Rehabilitation of bridges at 7 sites within the Mackay Regional Council area.
Read More
MACKAY REGIONAL COUNCIL PIONEER VALLEY BRIDGES WORKS
11 April 2025

MACKAY REGIONAL COUNCIL PIONEER VALLEY BRIDGES WORKS

Construction works associated with rehabilitation &/or renewal of the bridge assets within 5 sites at Mackay Regional Council – Pioneer Valley area (Site 1 – Walker-Finn Road Bridge – Pinnacle, […]
Read More
PETRIE STREET  CULVERT UPGRADE
11 April 2025

PETRIE STREET CULVERT UPGRADE

Replacement of the floodgates at the Petrie Street culvert crossing & installation of a new trash rack & maintenance ramp in the southeast main drain upstream.
Read More
SYDNEY AND RIVER STREET INTERSECTION AND BLUEWATER TRAIL UPGRADE
11 April 2025

SYDNEY AND RIVER STREET INTERSECTION AND BLUEWATER TRAIL UPGRADE

Sydney & River Street Intersection improvement works. This project focusses on improving the connectivity for active transport users, including pedestrians & cyclists, on the principal cycle network between the Bluewater […]
Read More
CARRANYA ROAD CAUSEWAY REPLACEMENT
11 April 2025

CARRANYA ROAD CAUSEWAY REPLACEMENT

Replacement of causeway at Carranya Road. Scope of work includes: establishment of a side track & associated traffic management. Removal & replacement of existing culverts.
Read More
BREWERS ROAD & PLANE CREEK BANK STABILISATION
11 April 2025

BREWERS ROAD & PLANE CREEK BANK STABILISATION

Bank stabilisation works at 2 locations along Plane Creek in Sarina.
Read More