Project Status: Firm
11 April 2025
COOROORA CREEK BRIDGE REPLACEMENT
Design & construction for replacement of existing bridge at Cooroora Creek. Scope of work includes: construction of temporary side track. Demolition of existing bridge. Construction of new bridge structure. Construction […]
11 April 2025
COOROORA CREEK BRIDGE REPLACEMENT
Design & construction for replacement of existing bridge at Cooroora Creek. Scope of work includes: construction of temporary side track. Demolition of existing bridge. Construction of new bridge structure. Construction […]
11 April 2025
ISAAC REGIONAL COUNCIL PAVEMENT RESTORATION WORKS
Restoration works of pavement for 6 x local roads within various location at Isaac Regional Council (Russell Park Road, Mount McLaren Road, Peak Downs Mine Road, Barmount Road & Mabbin […]
11 April 2025
BRUCE HIGHWAY (10J PROSERPINE TO BOWEN) ROADWORKS
Safety roadworks including pavement rehabilitation & intersection treatments at Bruce Highway (between 10 Mile Creek & Yeates Creek).
11 April 2025
TED CUNNINGHAM BRIDGE
Replacement of Ted Cunningham Bridge at Strathmore Road (from Bowen Developmental Road). Scope of work includes: supply, installation & maintenance of site water, sewer, phone & electricity. Supply, installation, maintenance […]
11 April 2025
MACKAY REGIONAL COUNCIL SEWER PUMP STATION
Construct driveways that safely service Sewer Pump Stations at 9 locations around the Mackay Regional Council area. Works include but are not limited to: earthworks; installation of gravel; concrete & […]
11 April 2025
BRUCE HIGHWAY (MACKAY TO PROSERPINE) ROADWORKS
Road intersection upgrades & increasing the vertical grade line of the highway through the existing floodway within Jumper Creek at Bruce Highway – Mackay to Proserpine (Knobels Road/Nebia-Coningsby Road).
11 April 2025
MWD REASEAL OF 88A & 88B BOWNS DEVELOPMENTAL ROAD & 5307 COLLINSVILLE ELPHINSTONE ROAD
Reseal of 88A Bowen Developmental Road – 0.045 0.580km; 3.040 9.160km; 19.187 23.798km; 23.853 31.662km; 31-672 32.3km; 49.487 61.965km; 61.965 63.26km; 63.260 75.849km & 79.481 80,565km. 88B Bowen Developmental Road […]
11 April 2025
NORTH COAST LINE MOUNT OSSA PASSING LOOP EXTENSION
Extension of the passing loop from Chainages 1008.531 to chainage 1010, a length of 1360m.
11 April 2025
MACKAY/WHITSUNDAY DISTRICT – NATIONAL HIGHWAY RESEAL WORKS
Road reseal works at Mackay/Whitsunday District (Bruce Highway & Sarina Homebush Road). Scope of work includes: rut correction & asphalt pavement repairs.
11 April 2025
BRUCE HIGHWAY & MACKAY BUCASIA ROAD ASPHALT REPLACEMENT WORKS
Asphalt replacement works at Bruce Highway & Mackay Bucasia Road.