Project Status: Possible

COLLINSVILLE NORTH SOLAR PROJECT
11 April 2025

COLLINSVILLE NORTH SOLAR PROJECT

Construction of a solar farm with a generation capacity of up to 150 megawatts (MWac), with current peak capacity estimated to be 130MWdc.
Read More

Topics

COLLINSVILLE NORTH SOLAR PROJECT
11 April 2025

COLLINSVILLE NORTH SOLAR PROJECT

Construction of a solar farm with a generation capacity of up to 150 megawatts (MWac), with current peak capacity estimated to be 130MWdc.
Read More
BURDEKIN RIVER PIPELINE
11 April 2025

BURDEKIN RIVER PIPELINE

Construction of a 105km long underground pipeline to transport water from Burdekin Falls Dam along a corridor that will link the Burdekin River at Home Hill, through to Gumlu, Guthalungra, […]
Read More
HYNQ – NORTH QUEENSLAND CLEAN ENERGY PROJECT
11 April 2025

HYNQ – NORTH QUEENSLAND CLEAN ENERGY PROJECT

Construction of a hydrogen, green ammonia, freshwater & renewable electricity export hub. The renewable hydrogen will be used to produce green ammonia, primarily for export markets, & liquid hydrogen for […]
Read More
PROSERPINE WIND FARM
11 April 2025

PROSERPINE WIND FARM

Construction of a 900MW wind farm, located to the west of Peter Faust (Lake Proserpine) Dam & approximately 60 km west of Airlie Beach, in 2 stages. Stage 1: 450MW, […]
Read More
MIRANI SOLAR FARM
11 April 2025

MIRANI SOLAR FARM

Construction of a solar farm with an output measuring 60 megawatts. The solar farm to cover 173 hectares & comprise 180,000 solar photovoltaic modules. The solar panels to be installed […]
Read More
LOTUS CREEK WIND FARM
11 April 2025

LOTUS CREEK WIND FARM

Construction of a 285MW wind farm at Lotus Creek on the Connors Range 20km west of St Lawrence comprising 46 Vestas wind turbines each up to 7MW & associated infrastructure […]
Read More
CLARKE CREEK SOLAR FARM
11 April 2025

CLARKE CREEK SOLAR FARM

The Clarke Creek solar farm will be developed with up to 400MW of photovoltaic (PV) solar panel installations on a flat site below the wind farm site. The solar panels […]
Read More
ATP814P BOWEN BASIN CSG & SHALE PROJECT
11 April 2025

ATP814P BOWEN BASIN CSG & SHALE PROJECT

ATP814P consists of seven disconnected blocks in the Bowen Basin in an area ranging from south of Moranbah up to Newlands in the Northern Bowen Basin. This general area is […]
Read More
DYSART SOLAR FARM
11 April 2025

DYSART SOLAR FARM

Construction of a solar farm of up to 100MW with up to 360,000 solar PV panels.
Read More
OAK STREET DRAINAGE RESTORATION
11 April 2025

OAK STREET DRAINAGE RESTORATION

Design & installation of a rehabilitation system using trenchless technology to improve functionality of the drainage infrastructure & restoration of its intended level of performance by insitu lining & concrete […]
Read More