Project Status: Possible
11 April 2025
VULCAN SOUTH COAL MINE – OFFICES, FUEL STORAGE & WORKSHOPS
Provision of offices, fuel storage & workshops.
11 April 2025
VULCAN SOUTH COAL MINE – OFFICES, FUEL STORAGE & WORKSHOPS
Provision of offices, fuel storage & workshops.
11 April 2025
VULCAN SOUTH COAL MINE
A small-scale mining operation, which includes an open-cut mining area and a smaller highwall mining trial area. Premium hard coking coal will be extracted from three separate open-cut pits for […]
11 April 2025
VULCAN SOUTH COAL MINE – RAIL & ROAD INFRASTRUCTURE
Rail loop and train load-out facility at a location between the northern and central pits. Realignment of the existing Saraji Road and services infrastructure required.
11 April 2025
ISAAC RIVER COKING COAL PROJECT
A project covering an area of 14sq km, based on an updated Mineral Resource Estimate of 8.7Mt of which 5.5Mt is Indicated & 3.2Mt is Inferred. Proposed open cut along […]
11 April 2025
SARAJI EAST COAL PROJECT – GAS DRAINAGE BORES
Construction of a network of gas drainage bores.
11 April 2025
SARAJI EAST COAL PROJECT – GAS & WATER COLLECTION NETWORKS
Construction of gas & water collection networks & access tracks.
11 April 2025
SARAJI EAST COAL PROJECT – WATER PIPELINE RELOCATION
Relocation of the existing Vermont water pipeline.
11 April 2025
SARAJI EAST COAL PROJECT – ROM STOCKPILE & PRODUCT STOCKPILE PADS
For the provision of run of the mine stockpile & product stockpile pads.
11 April 2025
SARAJI EAST COAL PROJECT – COAL HANDLING & PREPARATION PLANT
For the provision of a coal handling & preparation plant.
11 April 2025
SARAJI EAST COAL PROJECT – TAILINGS STORAGE FACILITY
Dewatered tailings & reject disposal facility within waste rock dumps on the Saraji Mine.