SARAJI EAST COAL PROJECT – MINE INFRASTRUCTURE AREA
11 April 2025

SARAJI EAST COAL PROJECT – MINE INFRASTRUCTURE AREA

For the provision of a mine infrastructure area.
Read More

Topics

SARAJI EAST COAL PROJECT – MINE INFRASTRUCTURE AREA
11 April 2025

SARAJI EAST COAL PROJECT – MINE INFRASTRUCTURE AREA

For the provision of a mine infrastructure area.
Read More
PEAK DOWNS MINE CONTINUATION PROJECT
11 April 2025

PEAK DOWNS MINE CONTINUATION PROJECT

Expansion of open cut metallurgical coal mining footprint at the existing Peak Downs Mine, producing up to 18 million tonnes of product coal per annum for approximately 93 years, for […]
Read More
SARAJI EAST COAL PROJECT – CONVEYOR SYSTEM
11 April 2025

SARAJI EAST COAL PROJECT – CONVEYOR SYSTEM

For the provision of a conveyor system to deliver coal from the underground portals to the CHPP and product coal to rail loading facilities.
Read More
DYSART EAST COAL MINE PROJECT
11 April 2025

DYSART EAST COAL MINE PROJECT

Development & operation of an open cut coal mine & associated infrastructure. To produce approximately 1.9Mtpa of ROM coal.
Read More
SARAJI EAST COAL PROJECT – RAIL SPUR & BALLOON LOOP & SIGNALLING SYSTEM
11 April 2025

SARAJI EAST COAL PROJECT – RAIL SPUR & BALLOON LOOP & SIGNALLING SYSTEM

For the provision of a new rail spur & balloon loop & signalling system to be located on the site of the existing adjacent Saraji Mine.
Read More
SARAJI EAST COAL PROJECT – UNDERGROUND COAL MINE
11 April 2025

SARAJI EAST COAL PROJECT – UNDERGROUND COAL MINE

A greenfield underground coal mine development located on MLA 70383.
Read More
SARAJI EAST COAL PROJECT
11 April 2025

SARAJI EAST COAL PROJECT

Development of a greenfield underground single-seam mine operation and associated project infrastructure, adjacent the existing Saraji open cut mine. The Project involves the extraction of up to seven million tonnes […]
Read More
MOORLANDS COAL PROJECT
11 April 2025

MOORLANDS COAL PROJECT

A project based on an upgraded resource estimate (measured, indicated, inferred) of 318.0 million tonnes (Mt). Open cut mining at a rate of 1.9 Mtpa by a contractor using truck […]
Read More
AIR WHITSUNDAY ROAD AIRCRAFT HANGAR SHEDS
11 April 2025

AIR WHITSUNDAY ROAD AIRCRAFT HANGAR SHEDS

Construction of 3 aircraft hangar sheds (1440sq m). Roller shutter door, concrete slab. Associated car parking & landscaping.
Read More
PROSERPINE SHUTE HARBOUR ROAD DUPLICATION ROADWORKS UPGRADE
11 April 2025

PROSERPINE SHUTE HARBOUR ROAD DUPLICATION ROADWORKS UPGRADE

Upgrade to Proserpine Shute Harbour road from 2 to 4 lanes. To include intersection upgrades between Tropic Road & Valley Drive. Additional lane each way between Paluma Road &Tropic Road. […]
Read More