ATP 688P BOWEN BASIN CSG PROJECT
Posted
11 April 2025
A project with a reported 3P (proved, probable & possible) Gas Reserves Estimate of 152 Petajoules (PJ) & a gas reserves target of 355PJ. The Tilbrook CSG pilot is designed to appraise the Moranbah Coal Measures & is comprised of one dual-lateral horizontal appraisal well (Tilbrook #8), one vertical appraisal well (Tilbrook #7) & two observation wells (Tilbrook #4 & Tilbrook #6). The pilot is located 60 km to the south of Collinsville, adjacent to the Moranbah to Townsville gas pipeline. Production testing at Mount Saint Martin (MSM-2, 3 & 4) expected to generate a certified reserve estimate prior to recommencement of production testing at Tilbrook (Tilbrook-7 & 8).