HILLALONG JOINT VENTURE COAL PROJECT
Posted
11 April 2025
A project covering an area of 99sq km considered prospective for coal. Based on an updated total Mineral Resource Estimate of 106 million tonnes (56M t Inferred and 50M t Indicated). Mineral Resource Estimate for Hillalong South at 64M t. Project is planned to operate as a satellite pit within the Burton complex with production processed through that infrastructure.