ISAAC RIVER COKING COAL PROJECT
Posted
11 April 2025
A project covering an area of 14sq km, based on an updated Mineral Resource Estimate of 8.7Mt of which 5.5Mt is Indicated & 3.2Mt is Inferred. Proposed open cut along with highwall mining, utilising off site infrastructure & toll washing of mined coal at a nearby facility. A production target of between 0.4mtpa to 0.6mtpa over a 4 to 5 year period is anticipated.