PEAK DOWNS MINE CONTINUATION PROJECT

Posted
11 April 2025

Expansion of open cut metallurgical coal mining footprint at the existing Peak Downs Mine, producing up to 18 million tonnes of product coal per annum for approximately 93 years, for steel production. Includes continuation of open-cut mining operations and use of various existing infrastructure (coal handling and preparation plant, rail loading facilities and other); relocation of various existing infrastructure (transmission line, substation feeder, Eungella Water Pipeline southern extension and other); realignment of Peak Downs Mine Road and associated rail level crossing; development of water course diversions, levees and relocation of dams; construction of new / upgrades of existing infrastructure (access roads, workshops, electricity distribution and other ancillary infrastructure)