Development Type: New
11 April 2025
BYERWEN COAL PROJECT
Development of 8 open cut pits (East Pits 1 & 2, North Pit, South Pits 1 & 2, West Pits 1, 2 & 3) over a life of mine (LoM) […]
11 April 2025
BYERWEN COAL PROJECT
Development of 8 open cut pits (East Pits 1 & 2, North Pit, South Pits 1 & 2, West Pits 1, 2 & 3) over a life of mine (LoM) […]
11 April 2025
NEW LENTON COAL PROJECT – INFRASTRUCTURE
For the provision of infrastructure to include offices, administrations buildings, amenities, including 350 bed accommodation refurbishment, workshops & warehouses.
11 April 2025
ISAAC PLAINS EAST COAL PROJECT
Development of open cut pits in an adjoining area to the east of the existing Isaac Plains mining lease to extend the life of mine by approximately 7 years. Based […]
11 April 2025
NEW LENTON THERMAL COAL – STAGE 1
Stage 1 of a project based on a total Resource Estimate of 84 million tonnes (Mt). Initial recommencement of open cut & underground operations on ML70337 to generate up to […]
11 April 2025
THE CARMICHAEL MINE COAL HANDLING PLANT
Including construction of coal sizing and conveying equipment; construction of coal stockpiling infrastructure; and construction of the train load out infrastructure.
11 April 2025
KARIN JOINT VENTURE COKING COAL PROJECT
The Karin Basin contains multiple, thick coal seams with exceptional coking coal properties; close to rail, water & power infrastructure as well as services in Clermont; Clean seams up to […]
11 April 2025
CARMICHAEL COAL MINE & RAIL PROJECT – COAL PREPARATION PLANT
Design, engineering & construction of Coal Preparation Plant, where the coal is processed and prepared for transport.
11 April 2025
POITREL COAL MINE CONTINUATION PROJECT
Continuation of the Poitrel open cut coal mine. The mine produced first coal in 2006 and has access to high-quality infrastructure, producing a mix of hard coking coal and pulverised […]
11 April 2025
MACKAY/WHITSUNDAY DISTRICT STATE NETWORK RESEAL PROGRAM
Reseal & rut correction works on the Bruce Highway between chainages 66.6041km & chainage 83.352km.
11 April 2025
HAIL CREEK COAL OPERATIONS EXPANSION
Open cut operations using dragline truck & shovel method based on a resource estimate of 136 million tonnes (Mt) of coal. After an expansion to 8Mtpa capacity, studies investigating underground […]