Development Type: New
11 April 2025
COLLINSVILLE IRRIGATION SCHEME
The Collinsville Irrigation Scheme Project comprises the proposed development of an irrigated agriculturaldevelopment area of up to 25,000 ha. Four master-planned precincts are being investigated located along the Bowen River […]
11 April 2025
COLLINSVILLE IRRIGATION SCHEME
The Collinsville Irrigation Scheme Project comprises the proposed development of an irrigated agriculturaldevelopment area of up to 25,000 ha. Four master-planned precincts are being investigated located along the Bowen River […]
11 April 2025
BURDEKIN RIVER PIPELINE
Construction of a 105km long underground pipeline to transport water from Burdekin Falls Dam along a corridor that will link the Burdekin River at Home Hill, through to Gumlu, Guthalungra, […]
11 April 2025
HAN-HO H2 HYDROGEN HUB
Construction of a green hydrogen hub. The project will produce up to 1.8 million tonnes per annum of green ammonia.
11 April 2025
URANNAH RENEWABLE ENERGY HUB STAGES 1 & 2
The Bowen renewable energy hub is 11.4 gigawatt renewable engery project. 1.4 gigawatts of pumped hydro, utilising the proposed Urannah Dam project delivered 2 stages. Stage 1 -A pumped hydro […]
11 April 2025
HYNQ – NORTH QUEENSLAND CLEAN ENERGY PROJECT
Construction of a hydrogen, green ammonia, freshwater & renewable electricity export hub. The renewable hydrogen will be used to produce green ammonia, primarily for export markets, & liquid hydrogen for […]
11 April 2025
PROSERPINE WIND FARM
Construction of a 900MW wind farm, located to the west of Peter Faust (Lake Proserpine) Dam & approximately 60 km west of Airlie Beach, in 2 stages. Stage 1: 450MW, […]
11 April 2025
CAPRICORNIA ENERGY HUB (BOWEN RENEWABLE ENERGY HUB PUMPED HYDRO-ELECTRIC SCHEME)
The Bowen Renewable Energy Hub (BREH) Pumped Hydro-electric Scheme (PHES) comprises the proposed construction of a PHES along the Broken River, Central Queensland. This PHES will be connected into the […]
11 April 2025
WHITSUNDAY RAW WATER SUPPLY BORE DRILLING WORKS
Expand the existing raw water supply off-take works to provide for operational redundancy & optimisation of a robust & resilient raw water supply scheme supplying the Proserpine & Bowen Water […]
11 April 2025
COLLINSVILLE NORTH SOLAR PROJECT
Construction of a solar farm with a generation capacity of up to 150 megawatts (MWac), with current peak capacity estimated to be 130MWdc.
11 April 2025
BLOOMSBURY WATER PIPELINE
Construction of a new pipeline, new storage tank & a new booster pump from Midge Point Road, Bloomsbury to Midge Point