Development Type: New
11 April 2025
CRYSTALBROOK ROAD ROADWORKS
Pavement rehabilitation work within approximately 1.6km at Crystalbrook Road (chainages 1.81km to chainages 3.40km).
11 April 2025
CRYSTALBROOK ROAD ROADWORKS
Pavement rehabilitation work within approximately 1.6km at Crystalbrook Road (chainages 1.81km to chainages 3.40km).
11 April 2025
AIR WHITSUNDAY ROAD AIRCRAFT HANGAR SHEDS
Construction of 3 aircraft hangar sheds (1440sq m). Roller shutter door, concrete slab. Associated car parking & landscaping.
11 April 2025
COLLINSVILLE-ELPHINSTONE ROAD ROADWORKS & DRAINAGE WORKS
Pavement rehabilitation & associated drainage structure upgrade works within chainages 30.66km to 35.20km at Collinsville-Elphinstone Road.
11 April 2025
PROSERPINE SHUTE HARBOUR ROAD DUPLICATION ROADWORKS UPGRADE
Upgrade to Proserpine Shute Harbour road from 2 to 4 lanes. To include intersection upgrades between Tropic Road & Valley Drive. Additional lane each way between Paluma Road &Tropic Road. […]
11 April 2025
WHITSUNDAY REGIONAL COUNCIL RESEAL & REHABILITATION PACKAGE 2022/2023
Reseals & pavement rehabilitation works at Whitsunday Regional Council (Bowen, Collinsville, Proserpine & Whitsunday Coast Airport). Scope of work includes: single coat reseals. 2 x coat seals on rehab areas. […]
11 April 2025
HAMILTON PLAINS BORE FLOOD WORKS
The Hamilton Plains Flood Immunity upgrade project will improve the flood immunity of Proserpine Shute Harbour Road for the area between the Bruce Highway & Strathdickie Road. The new road […]
11 April 2025
BRUCE HIGHWAY (BOWEN-MERINDA) ROADWORKS
Construction formation widening & intersection upgrades for safety improvements including wide centreline treatment on the Bruce Highway.
11 April 2025
NULLA BRIDGE – UPGRADE
Nulla Bridge resurfacing & approaches which include asphalt mill & fill, waterproof sealing, replacement of expansion joints, pavement repair of approaches
11 April 2025
NEW LENTON COAL PROJECT – ROAD REALIGNMENT
Works to include the realignment of Suttor Developmental Road as it bisects the project coal resource area.
11 April 2025
MACKAY/WHITSUNDAY DISTRICT 2024/25 ASPHALT PROGRAM
Site ID A1: Bruce Highway (10H), Overtaking Lanes to Ridgewood Drive;Site ID A2: Mackay – Bucasia Road (856), Phillip Street Intersection;Site ID A3: Mackay – Bucasia Road (856), Holts Road […]