Development Type: New
11 April 2025
WINCHESTER SOUTH COKING COAL PROJECT – RAIL SPUR/ACCESS ROAD/INFRASTRUCTURE
Construction & operation of a rail spur, access road & associated infrastructure.
11 April 2025
WINCHESTER SOUTH COKING COAL PROJECT – RAIL SPUR/ACCESS ROAD/INFRASTRUCTURE
Construction & operation of a rail spur, access road & associated infrastructure.
11 April 2025
NORTH COAST LINE MOUNT OSSA PASSING LOOP EXTENSION
Extension of the passing loop from Chainages 1008.531 to chainage 1010, a length of 1360m.
11 April 2025
NORTH GAILILEE BASIN RAIL (NGBR) CARMICHAEL RAIL PROJECT
Construction of a 100 million tonne per annum (Mtpa) capacity standard gauge rail line branching off a narrow gauge line in the vicinity of Mistake Creek & trending north-south for […]
11 April 2025
MACKAY REGIONAL COUNCIL FOOTPATHS
Construction of connecting sections of footpaths within various locations at Mackay Regional Council. Scope of work includes: Project 51695 – Collette Court to Tolchers Lane, Marian. Project 51812 – Nanyima […]
11 April 2025
BRUCE HIGHWAY (10J PROSERPINE TO BOWEN) ROADWORKS
Safety roadworks including pavement rehabilitation & intersection treatments at Bruce Highway (between 10 Mile Creek & Yeates Creek).
11 April 2025
CARMICHAEL COAL MINE RAIL & PORT PROJECT – RAIL LINE
Rail requirements for the Carmichael mine includes construction of 86-kilometres of rail formation works, a road over rail bridge, nine waterway bridges, more than 200 culverts and 35 rail crossings.
11 April 2025
TED CUNNINGHAM BRIDGE
Replacement of Ted Cunningham Bridge at Strathmore Road (from Bowen Developmental Road). Scope of work includes: supply, installation & maintenance of site water, sewer, phone & electricity. Supply, installation, maintenance […]
11 April 2025
MT STUART BEDFORD WEIR ROAD REHABILITATION
Carry out pavement rehabilitation & erosion protection works on Mt Stuart Bedford Weir Road. Scope of work includes: Separable Portion 1 Mt Stuart Bedford Weir Road; the works are located […]
11 April 2025
BRUCE HIGHWAY (MACKAY TO PROSERPINE) ROADWORKS
Road intersection upgrades & increasing the vertical grade line of the highway through the existing floodway within Jumper Creek at Bruce Highway – Mackay to Proserpine (Knobels Road/Nebia-Coningsby Road).
11 April 2025
PHILLIPS CREEK BRIDGE REPLACEMENT
Replacement of bridge at Phillips Creek. Scope of work includes: demolition of existing bridge & rehabilitation of road alignment approaches.