Development Type: New
11 April 2025
33A PEAK DOWNS HIGHWAY (MACKAY/WHITSUNDAY DISTRICT) ASPHALT PROGRAM 2021/2022
Asphalt/pavement repair works at Peak Downs Highway (33A) – Mackay/Whitsunday District.
11 April 2025
33A PEAK DOWNS HIGHWAY (MACKAY/WHITSUNDAY DISTRICT) ASPHALT PROGRAM 2021/2022
Asphalt/pavement repair works at Peak Downs Highway (33A) – Mackay/Whitsunday District.
11 April 2025
BROUGHTON COAL PROJECT – ROADS
For the provision of a haul road, internal access roads & the road diversion of Suttor Developmental Road.
11 April 2025
COOROORA CREEK BRIDGE REPLACEMENT
Design & construction for replacement of existing bridge at Cooroora Creek. Scope of work includes: construction of temporary side track. Demolition of existing bridge. Construction of new bridge structure. Construction […]
11 April 2025
MACKAY REGIONAL COUNCIL SEWER PUMP STATION
Construct driveways that safely service Sewer Pump Stations at 9 locations around the Mackay Regional Council area. Works include but are not limited to: earthworks; installation of gravel; concrete & […]
11 April 2025
ISAAC REGIONAL COUNCIL CONCRETE FLOODWAY 2024
Upgrade of 7 x unsealed inverts to a concrete floodway & replacement of 2 x existing concrete floodway within various locations at Isaac Regional Council. Scope of work includes: construction […]
11 April 2025
MWD REASEAL OF 88A & 88B BOWNS DEVELOPMENTAL ROAD & 5307 COLLINSVILLE ELPHINSTONE ROAD
Reseal of 88A Bowen Developmental Road – 0.045 0.580km; 3.040 9.160km; 19.187 23.798km; 23.853 31.662km; 31-672 32.3km; 49.487 61.965km; 61.965 63.26km; 63.260 75.849km & 79.481 80,565km. 88B Bowen Developmental Road […]
11 April 2025
ISAAC REGIONAL COUNCIL PAVEMENT RESTORATION WORKS
Restoration works of pavement for 6 x local roads within various location at Isaac Regional Council (Russell Park Road, Mount McLaren Road, Peak Downs Mine Road, Barmount Road & Mabbin […]
11 April 2025
PIONEER VALLEY MOUNTAIN BIKE TRAILS STAGE 2
Stage 2 – 82km of bike trials between Finch Hatton & Eungella.
11 April 2025
MACKAY/WHITSUNDAY DISTRICT – NATIONAL HIGHWAY RESEAL WORKS
Road reseal works at Mackay/Whitsunday District (Bruce Highway & Sarina Homebush Road). Scope of work includes: rut correction & asphalt pavement repairs.
11 April 2025
THE MACKAY RING ROAD PROJECT STAGES 2 & 3
Mackay Ring road stage 2 to include construction of a 2-lane rural highway 8.2km in length from Bruce Highway north intersection to Harbour Road, connections at Glenella-Richmond Road & Valley […]