Development Type: New

NATIONAL HIGHWAY MICRO-SURFACING PACKAGE 2021-2022
11 April 2025

NATIONAL HIGHWAY MICRO-SURFACING PACKAGE 2021-2022

Micro-surfacing works within chainages 106.742km to chainages 108.200km at National Highway 10G (Bruce Highway – St Lawrence to Mackay).
Read More

Topics

NATIONAL HIGHWAY MICRO-SURFACING PACKAGE 2021-2022
11 April 2025

NATIONAL HIGHWAY MICRO-SURFACING PACKAGE 2021-2022

Micro-surfacing works within chainages 106.742km to chainages 108.200km at National Highway 10G (Bruce Highway – St Lawrence to Mackay).
Read More
MACKAY REGIONAL COUNCIL PIONEER VALLEY BRIDGES WORKS
11 April 2025

MACKAY REGIONAL COUNCIL PIONEER VALLEY BRIDGES WORKS

Construction works associated with rehabilitation &/or renewal of the bridge assets within 5 sites at Mackay Regional Council – Pioneer Valley area (Site 1 – Walker-Finn Road Bridge – Pinnacle, […]
Read More
BRUCE HIGHWAY (MACKAY RING ROAD BALD HILL CONNECTION) ROADWORKS
11 April 2025

BRUCE HIGHWAY (MACKAY RING ROAD BALD HILL CONNECTION) ROADWORKS

Upgrade works for approximately 400m section from 2 lane undivided carriageway to a 4 lanes divided carriageway at Bruce Highway (Mackay Ring Road Bald Hill connection).
Read More
PETRIE STREET  CULVERT UPGRADE
11 April 2025

PETRIE STREET CULVERT UPGRADE

Replacement of the floodgates at the Petrie Street culvert crossing & installation of a new trash rack & maintenance ramp in the southeast main drain upstream.
Read More
BRUCE HIGHWAY & MACKAY BUCASIA ROAD ASPHALT REPLACEMENT WORKS
11 April 2025

BRUCE HIGHWAY & MACKAY BUCASIA ROAD ASPHALT REPLACEMENT WORKS

Asphalt replacement works at Bruce Highway & Mackay Bucasia Road.
Read More
SYDNEY AND RIVER STREET INTERSECTION AND BLUEWATER TRAIL UPGRADE
11 April 2025

SYDNEY AND RIVER STREET INTERSECTION AND BLUEWATER TRAIL UPGRADE

Sydney & River Street Intersection improvement works. This project focusses on improving the connectivity for active transport users, including pedestrians & cyclists, on the principal cycle network between the Bluewater […]
Read More
PEAK DOWNS & GREGORY HIGHWAYS ROADWORKS
11 April 2025

PEAK DOWNS & GREGORY HIGHWAYS ROADWORKS

Slurry micro-surfacing works on Peak Downs Highway & Gregory Highway.
Read More
CARRANYA ROAD CAUSEWAY REPLACEMENT
11 April 2025

CARRANYA ROAD CAUSEWAY REPLACEMENT

Replacement of causeway at Carranya Road. Scope of work includes: establishment of a side track & associated traffic management. Removal & replacement of existing culverts.
Read More
PEAK DOWNS HIGHWAY RESEAL WORKS
11 April 2025

PEAK DOWNS HIGHWAY RESEAL WORKS

Reseal of various sections of 33A & 33B Peak Downs Highway on the below locations within Mackay, Isaac Regional Council region. 33A 0.441km-136.069km & 33B 17.243km -25.768km. Scope of work […]
Read More
CATHU CAULEY CIVIL ROADWORKS
11 April 2025

CATHU CAULEY CIVIL ROADWORKS

Restoration of Cathu Cauley Road which forms access to visitor & maintenance facilities and Jaxut camping area at Cathu Cauley State Forest.
Read More