URANNAH DAM & PIPELINES PROJECT
11 April 2025

URANNAH DAM & PIPELINES PROJECT

Construction of a new dam on the Broken River at Urannah in Central Queensland, with additional components that include a water distribution network, comprising 200km of connecting water pipelines & […]
Read More

Topics

URANNAH DAM & PIPELINES PROJECT
11 April 2025

URANNAH DAM & PIPELINES PROJECT

Construction of a new dam on the Broken River at Urannah in Central Queensland, with additional components that include a water distribution network, comprising 200km of connecting water pipelines & […]
Read More
MIRANI SOLAR FARM
11 April 2025

MIRANI SOLAR FARM

Construction of a solar farm with an output measuring 60 megawatts. The solar farm to cover 173 hectares & comprise 180,000 solar photovoltaic modules. The solar panels to be installed […]
Read More
WHITSUNDAY REGIONAL COUNCIL SEWER RELINING WORKS SOUTHERN REGION
11 April 2025

WHITSUNDAY REGIONAL COUNCIL SEWER RELINING WORKS SOUTHERN REGION

Sewer relining works at Whitsunday Regional Council (Proserpine, Cannonvale & Jubilee Pocket). Scope of work includes: CCTV. Cleaning & relining of existing sewer mains including replacement of sections where it […]
Read More
MORANBAH 400ML RAW WATER DAM REMEDIATION WORKS
11 April 2025

MORANBAH 400ML RAW WATER DAM REMEDIATION WORKS

Remediation works of 400ML raw water dam at Moranbah. Scope of work includes: repair the upstream erosion with compacted soil fill. Place rock protection over geotextile in the upstream erosion […]
Read More
COLLINSVILLE GREEN ENERGY HUB
11 April 2025

COLLINSVILLE GREEN ENERGY HUB

Construction of a large-scale wind & solar project proposed for an area near Collinsville and south-west of Bowen, & located within the Northern Queensland Renewable Energy Zone, which will generate […]
Read More
NORTHERN BOWEN BASIN AUGMENTATION
11 April 2025

NORTHERN BOWEN BASIN AUGMENTATION

Construction of a double circuit transmission line between Nebo & Broadlea substations. The line between Nebo & Moorvale South is to be constructed for 275kV. The section from Moorvale South […]
Read More
CLERMONT WASTE MANAGEMENT FACILITY RECONFIGURATION & WEIGHBRIDGE INSTALLATION
11 April 2025

CLERMONT WASTE MANAGEMENT FACILITY RECONFIGURATION & WEIGHBRIDGE INSTALLATION

Design & construction for reconfiguration of facility & installation of 60T weighbridge at Clermont Waste Management Facility. Scope of work includes: earthworks, concrete works, gatehouse building & associated works.
Read More
OAK STREET DRAINAGE RESTORATION
11 April 2025

OAK STREET DRAINAGE RESTORATION

Design & installation of a rehabilitation system using trenchless technology to improve functionality of the drainage infrastructure & restoration of its intended level of performance by insitu lining & concrete […]
Read More
MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE
11 April 2025

MORANBAH TO GOONYELLA RIVERSIDE 132KV TRANSMISSION LINE

Construction of a double circuit transmission line between Moranbah & Goonyella Riverside substations. It is proposed to parallel the existing 132kV between Moranbah & Goonyella Riverside & the new transmission […]
Read More
BLUE GRASS CREEK JOINT VENTURE GOLD PROJECT
11 April 2025

BLUE GRASS CREEK JOINT VENTURE GOLD PROJECT

An early stage prospective project covering an area of 24.2sq km located in in the Drummond Basin region, Central Queensland, directly contiguous to the Hill 212 Gold Project.
Read More