Development Type: New
11 April 2025
JOYCE MECHANICAL SERVICES
Construction of an industrial development to comprise 980sq m workshop, 425sq m warehouse, 2 igloo shelters, wash bay shelter & a 2 storey offices (400sq m) with boardroom, administration, lunch […]
11 April 2025
JOYCE MECHANICAL SERVICES
Construction of an industrial development to comprise 980sq m workshop, 425sq m warehouse, 2 igloo shelters, wash bay shelter & a 2 storey offices (400sq m) with boardroom, administration, lunch […]
11 April 2025
KERRISDALE ESTATE STAGES 5C, 6A, 6B, 7 & 8
Reconfiguration of 1 lot into 127 residential lots & balance lots in Stages 5C, 6A, 6B, 7 & 8. Stage 5C – Lot 5410. Stage 6 – 44 lots (split […]
11 April 2025
HASTINGS DEERING DISTRIBUTION WAREHOUSE & OFFICE
Construction of new 2 storey warehouse & distribution centre for Hastings Deering. To include 17555sq m warehouse, 807sq m wokshop for fitting & assembly of hydraulic hoses & components. 212sq […]
11 April 2025
KERRISDALE ESTATE SUBDIVISION STAGE 3
Reconfiguration of 2 lots into 39 residential lots plus 1 local utility lot & 2 balance lots. Associated civil works.
11 April 2025
HAYMANS SOUTH MACKAY WAREHOUSE
Removal of existing building. Construction of a single storey warehouse building to comprise warehouse area, office area, trade area, manager’s office, lunch room, amenities & delivery office. Signage. Concrete tilt […]
11 April 2025
KERRISDALE GARDENS AGED CARE FACILITY
Construction of 4 storey residential care facility. Ground floor to provide 1 x 3 bedroom & 4 x 1 bedroom units, chapel, mens shed & lobby. 16 aged care units […]
11 April 2025
HITACHI MACKAY INDUSTRIAL FACILITY
Construction of an industrial facility to include a large workshop, warehouse space in the main building fronting Centurion Drive, 2 storey ancillary office & administration spaces are provided on the […]
11 April 2025
KESWICK ISLAND
Potential major redevelopment of island. Previous approval for a 117 hectare residential & tourist resort. The redevlopment may comprise houses, a hotel, a new boat ramp and jetty and a […]
11 April 2025
HOLY SPIRIT COLLEGE CLASSROOM BLOCKS & SPORTS COURTS
Removal of existing hospitality & manual arts buildings & existing maintenance sheds. Construction of new single storey industrial design & technology building (INTAD) with metal, wood & hybrid workshops preparing […]
11 April 2025
KINCHANT DAM OUTDOOR EDUCATION CENTRE DINING HALL UPGRADE
Upgrade of dining hall at Kinchant Dam Outdoor Education Centre.