Development Type: New
11 April 2025
SYDNEY STREET WATER MAIN WORKS
Construction of a new water main for the replacement of the existing ageing water main at Sydney Street between River Street & Shakespeare Street. Scope of work includes: site establishment […]
11 April 2025
SYDNEY STREET WATER MAIN WORKS
Construction of a new water main for the replacement of the existing ageing water main at Sydney Street between River Street & Shakespeare Street. Scope of work includes: site establishment […]
11 April 2025
MOUNT COOLON JOINT VENTURE GOLD PROJECT – HEAP LEACH PLANT
Construction of a heap leach plant.
11 April 2025
BLOOMSBURY WATER PUMP STATION
Design, supply & installation of a demountable chlorination building complete with chlorination materials & equipment necessary for the Bloomsbury Chlorine Dosing System at Bloomsbury Water Pump Station. Scope of work […]
11 April 2025
MOUNT COOLON JOINT VENTURE GOLD PROJECT – CIL PLANT
Construction of a CIL plant.
11 April 2025
MACKAY REGIONAL COUNCIL SEWAGE PUMP STATIONS
Refurbishment works for 10 sewage pump station sites within Council areas at Mackay Regional Council (Pacific Drive No1 Sewage Pump Station (PSEI10) – Blacks Beach, Willetts Road Sewage Pump Station […]
11 April 2025
YANDAN MINE SITE GOLD PROJECT
A project, covering an area of 952sq km, based on a Total Mineral Resource Estimate of 15.9 Mt @ 1.0 g/tAu for 514,500 oz Au. Project originally produced 350,000 oz […]
11 April 2025
SARINA NORTHERN DRAINAGE STAGE 2
Construction of an open trunk drain at Sarina. Scope of work includes: site establishment/disestablishment. Location & protection of existing services. Clearing & grubbing works. Earthworks. Backfilling. Erosion & sediment control […]
11 April 2025
HILL 212 JOINT VENTURE GOLD SILVER PROJECT
A project covering an area of 19.2sq km considered prospective for silver & gold.
11 April 2025
VULCAN SOUTH COAL MINE – RAIL & ROAD INFRASTRUCTURE
Rail loop and train load-out facility at a location between the northern and central pits. Realignment of the existing Saraji Road and services infrastructure required.
11 April 2025
MOUNT CARLTON GOLD SILVER & COPPER OPERATIONS
A 12 year life-of-mine (LoM) project based on a Reserve Estimate of 9.7million tonnes (Mt) containing 17,346,000ounces of silver, 34,000t of copper & 812,000ounces of gold. Open cut extraction at […]