Development Type: New
11 April 2025
BROUGHTON COAL PROJECT – ROM STOCKPILE
For the provision of a ROM coal stockpile.
11 April 2025
BROUGHTON COAL PROJECT – ROM STOCKPILE
For the provision of a ROM coal stockpile.
11 April 2025
WINCHESTER SOUTH COKING COAL PROJECT – TRANSMISSION LINE
Construction and maintainance of a 45 km electricity transmission line.
11 April 2025
MORANBAH SOUTH JOINT VENTURE COAL PROJECT
A project based on a resource estimate of 471 million tonnes (Mt) of coal. Longwall & bord & pillar mining at a rate of 18 million tonnes per annum (Mtpa) […]
11 April 2025
WINCHESTER SOUTH COKING COAL PROJECT – WATER PIPELINE
Construction & operation of a 14 km water pipeline.
11 April 2025
VULCAN SOUTH COAL MINE – OFFICES, FUEL STORAGE & WORKSHOPS
Provision of offices, fuel storage & workshops.
11 April 2025
CAVAL RIDGE COAL MINE HORSE PIT EXPANSION PROJECT
Construction of a new pit including relocating of equipment and infrastructure across to the new pit, with various electrical, water, transport and storage facilities to also be constructed, to allow […]
11 April 2025
VULCAN SOUTH COAL MINE
A small-scale mining operation, which includes an open-cut mining area and a smaller highwall mining trial area. Premium hard coking coal will be extracted from three separate open-cut pits for […]
11 April 2025
CARMICHAEL COAL MINE & RAIL PROJECT – EXPRESSION OF INTEREST CONSTRUCTION OF MINE AFFECTED WATER DAM
Bravus Mining and Resources is opening expressions of interest for suitably qualified and experienced earthworks and civil construction contractors to construct the Mine Affected Dam (MAW), at the Carmichael Coal […]
11 April 2025
PEAK DOWNS MINE CONTINUATION PROJECT
Expansion of open cut metallurgical coal mining footprint at the existing Peak Downs Mine, producing up to 18 million tonnes of product coal per annum for approximately 93 years, for […]
11 April 2025
SARAJI EAST COAL PROJECT – UNDERGROUND COAL MINE
A greenfield underground coal mine development located on MLA 70383.