Project Industry: MINING

BROUGHTON COAL PROJECT – MINE INFRASTRUCTURE AREA
11 April 2025

BROUGHTON COAL PROJECT – MINE INFRASTRUCTURE AREA

For the provision of a mine infrastructure area, magazine, workshops, office buildings & crib rooms.
Read More

Topics

BROUGHTON COAL PROJECT – MINE INFRASTRUCTURE AREA
11 April 2025

BROUGHTON COAL PROJECT – MINE INFRASTRUCTURE AREA

For the provision of a mine infrastructure area, magazine, workshops, office buildings & crib rooms.
Read More
NEW LENTON COAL PROJECT
11 April 2025

NEW LENTON COAL PROJECT

A project based on a Resource Estimate of 84 million tonnes (Mt). Open cut operations targeting the Leichardt & Vermont Seams of the Rangal Coal Measures & underground operations targeting […]
Read More
BROUGHTON COAL PROJECT
11 April 2025

BROUGHTON COAL PROJECT

A project based on an upgraded Resource Estimate 120.9 million tonnes (Mt), comprising 17.8Mt Measured, 11.1Mt Indicated & 92Mt Inferred Resource. Construction of a 2.4 million tonnes per annum (Mtpa) […]
Read More
NEW LENTON COAL PROJECT – POWER SUPPLY
11 April 2025

NEW LENTON COAL PROJECT – POWER SUPPLY

For the provision of a power supply.
Read More
BROUGHTON COAL PROJECT – RAIL LOOP & TRAIN LOAD OUT FACILITY
11 April 2025

BROUGHTON COAL PROJECT – RAIL LOOP & TRAIN LOAD OUT FACILITY

For the provision of a rail line loop & train load out facility.
Read More
BUNDARRA COPPER/SILVER/GOLD PROJECT
11 April 2025

BUNDARRA COPPER/SILVER/GOLD PROJECT

A project in the Lower Permian to Triassic Bowen Basin, west of South Connors Arch. Copper mineralisation in the Flora and Kerlong Ranges occurs on and around the margins of […]
Read More
BROUGHTON COAL PROJECT – WATER PIPELINE
11 April 2025

BROUGHTON COAL PROJECT – WATER PIPELINE

For the provision of a water pipeline.
Read More
WINCHESTER SOUTH COKING COAL PROJECT
11 April 2025

WINCHESTER SOUTH COKING COAL PROJECT

Based on an updated Mineral Resource Estimate of 1,100Mt coal. Greenfield metallurgical coal mine with a yield of up to 8 million tonnes of product coal for approximately 31 years, […]
Read More
BROUGHTON COAL PROJECT – ROM STOCKPILE
11 April 2025

BROUGHTON COAL PROJECT – ROM STOCKPILE

For the provision of a ROM coal stockpile.
Read More
WINCHESTER SOUTH COKING COAL PROJECT – TRANSMISSION LINE
11 April 2025

WINCHESTER SOUTH COKING COAL PROJECT – TRANSMISSION LINE

Construction and maintainance of a 45 km electricity transmission line.
Read More